Vista Point 2R-LR061108
REED EnGinEERinG
GEOTECHNICAL AND G R Cl U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 45
REG PROJECT NO. 13581
SAMPLE DATE: 10-11-06
TECHNICIAN: D. Decuir
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
location of Sam
Set Number
1
Ie
location
Inlet Walls: Line ST-1, STA 0+00
Junction Box: Line ST-1, STA 0+35 and Line ST-2,
ST A 0+00
Mix Identification
1701
ecified Stren
4200
Date Tested
10-18-06
11-08-06
11-08-06
Hold
Age@
Test
7
28
28
H
Total load
Ibs.
101790
135300
142400
4920
C linder Data
Set Cylinder
No. ID
1 7499
Air
Entrainment
4.0
Ticket
Number
3221661
Extranet
Distribution: (1) Jackson Shaw Company!
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214) 3505600 . FAX [214] 3500019