Loading...
Vista Point 2R-LR061108 REED EnGinEERinG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 45 REG PROJECT NO. 13581 SAMPLE DATE: 10-11-06 TECHNICIAN: D. Decuir PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. location of Sam Set Number 1 Ie location Inlet Walls: Line ST-1, STA 0+00 Junction Box: Line ST-1, STA 0+35 and Line ST-2, ST A 0+00 Mix Identification 1701 ecified Stren 4200 Date Tested 10-18-06 11-08-06 11-08-06 Hold Age@ Test 7 28 28 H Total load Ibs. 101790 135300 142400 4920 C linder Data Set Cylinder No. ID 1 7499 Air Entrainment 4.0 Ticket Number 3221661 Extranet Distribution: (1) Jackson Shaw Company! Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214) 3505600 . FAX [214] 3500019