Loading...
Vista Point 2R-LR061106 REED EnGInEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 44 REG PROJECT NO. 13581 SAMPLE DATE: 10-09-06 TECHNICIAN: Contractor PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. location of Sam Ie Set Number location 1 Junction Box Walls: ST A 0+35 Desi n Information Source of Concrete NA Mix Identification NA ecified Stren 4200 Date Tested 10-16-06 11-06-06 11-06-06 Hold Age@ Test 7 28 28 H Total load Ibs. 93730 127360 125480 4480 Air Entrainment NA Ticket Number NA Submitted by: Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019