Vista Point 2R-LR061106
REED EnGInEERInG
GEOTECHNICAL AND G R Cl U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 44
REG PROJECT NO. 13581
SAMPLE DATE: 10-09-06
TECHNICIAN: Contractor
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
location of Sam Ie
Set Number location
1 Junction Box Walls: ST A 0+35
Desi n Information
Source of Concrete
NA
Mix Identification
NA
ecified Stren
4200
Date Tested
10-16-06
11-06-06
11-06-06
Hold
Age@
Test
7
28
28
H
Total load
Ibs.
93730
127360
125480
4480
Air
Entrainment
NA
Ticket
Number
NA
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019