Loading...
Vista Point 2R-LR060920 REED EnGinEERinG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Curve No. 5 Soil Classification Brown cia lime-treated Proctor T e ASTM D-698 99.5 C' 99.0 g, 98.5 ::- 98.0 ..c .2' 97.5 (]) ~ 97.0 ~ 96.5 o 96.0 +-' c 95.5 ::J 95.0 94.5 20.0 22.0 Moisture Content (%) 24.0 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin REPORT NO. 32 REPORT DATE: 09-20-06 REG PROJECT NO. 13581 SAMPLE DATE: 08-21-06 Optimum Moisture, % 21.8 Maximum Densit, cf 98.6 ...... 4.5 '+- l/) ;t:::. 4.0 .... Q) Q) 3.5 E e 3.0 Q) c 2.5 Q) a.. 2.0 Q) -6 1.5 o a.. 1.0 20.0 22.0 Moisture Content (%) 24.0 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr. Manager, C.M.T. BW/cdl 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REED EnGinEERinG GEOTECHNICAL AND G R Cl U p ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Proctor No. 1 2 3 4 ASTM Standard 0-698 0-698 0-698 0-698 Descri tion Brown sandy clay w/rock Oark gray clay Dark brown sandy clay (lime-treated) Brown sandy clay w/aggregate (Iime- treated) Brown lime-treated 5 0-698 Test No. 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 Date location 08-30-06 Storm Line 1 : ST A 2+00 Storm Line 1 : ST A 2+00 Storm Line 1 : ST A 2+00 Storm Line 1 : ST A 3+50 Storm Line 1: ST A 3+50 Storm Line 1: ST A 3+50 Storm Line 1: ST A 5+00 Storm Line 1: ST A 5+00 Storm Line 1: ST A 6+50 Storm Line 1: ST A 6+50 Storm Line 3: ST A 0+50 Storm Line 3: ST A 0+50 Storm Line 3: ST A 0+50 Storm Line 3: ST A 0+50 Storm Line 4: ST A 0+75 Storm Line 4: ST A 0+ 75 Storm Line 4: ST A 0+75 Storm Line 8: ST A 1 +50 Storm Line 8: ST A 3+00 09-06-06 Bldg Pad 4: B.3-6 Bldg Pad 4: C-3.8 Bldg Pad 4: C.5-1.5 09-07-06 Water Line: 100'S, 10'W(1) Water Line: 100'S, 1 0'W(1) Water Line: 115'S, 260'W(1) Water Line: 115'S, 260'W 1 Depth Below Final S. G. feet 2.0 1.0 0.0 2.0 1.0 0.0 1.0 0.0 1.0 0.0 3.0 2.0 1.0 0.0 2.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 Field Density c 85.3 85.7 85.5 85.9 106.6 86.2 106.4 106.0 106.2 86.4 106.5 86.0 105.8 106.3 86.6 106.7 106.9 86.5 107.1 95.0 93.8 94.3 85.2 105.3 86.8 104.8 REPORT NO. 29 REPORT DATE: 09-20-06 REG PROJECT NO. 13581 TECHNICIAN: G. Green PAGE: 1 of 2 Optimum Moisture, % 12.3 27.5 22.8 18.1 21.8 Field Moisture % 30.8 30.3 30.6 28.9 13.5 28.5 13.7 14.5 14.2 28.3 13.3 28.7 14.8 13.9 27.9 13.2 12.8 28.1 12.6 23.0 24.0 23.6 29.2 14.7 27.9 25.2 98.6 Proctor ID 2 2 2 2 1 2 1 1 1 2 1 2 2 1 2 1 1 2 1 5 5 5 2 1 2 1 Compaction level % 95.5 96.0 95.7 96.2 96.6 96.5 96.5 96.1 96.3 96.8 96.6 96.3 95.9 96.4 97.0 96.7 96.9 96.9 97.1 96.3 95.1 95.6 95.4 95.4 97.2 95.0 I I 2424 STUTZ DR . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . f"< [214] 3500019