DR8801-CS 881115 (2)COPPELL PUBLIC WORKS ~ovember ~5, ~988 TO: FROM: RE: Steve Goram, Director of Public Works Steven M. Morton, Chief Developmental Inspector Bethel Drainage Improvements Steve, as per your request for a follow up memo on our conversation, Buckelew Construction started work on 11/14/88. At 8:30 a.m. I conducted a detour verification for proper signage and spacing in accordance with approved plans and at 10:30 a.m., Freeport was closed to thru traffic. They issued a letter of notification to Minyard and Texas Stock Tab that their water would be turned off this coming weekend. This will not happen and the line lowering will tentatively take place Dec. 2-4. The reason i would not allow the l~owering to take place is 1) They are required to give Minyards and Texas Stock Tab a seven (7) day notice, not five (5) 2.) The process that will have to take place will take more than 5 days also 3) Shop drawings have not been approved by Clyde. Minyard 'and Texas. Stock Tab have be.en notified of the disregard letter. · This week they will make a 10" tap on Bethel and Miny~rd vault, pavement removal,~ tap on C.C.P. in Freeport, preferred storm drainage removal. Russell has.stamped their trench safety plans. SMM/bb