Windance Sub-CS 860221LNSTRUCTION, INC.
February 21] 1986
17090 DALLAS PARKWAY, SUITE 100
(214) 931-9898
Time-Tech, Inc.
5327.~. Central, iSuite 3i~
Dallas, Texas 75205
'~TTN: D~N~' M~CLURG
'KE: ~6pP~LL~U~D~LEkEs
Dear Sir:
Today I met w~%h Ra~dy~F~em~i] .ID~p~tor f~ th~ City. ~,_CO~p~i, _,.
regarding the finalization of our work on the above referenced project.
The foil~ing items ~iii need .~o be Corrected-before Mr. Fle~ing wfll
write his letter of ~cceptance: (AI~ listings are inside the project
except the' first one.)
o Remove_,.excess.concrete o~.'~e~ter'li~
of Harris Drive at north end. "MFC
O Grind gU~ter area aiong the'soU~h S'~de
inside of cul-de-sac. MFc
o ~saw. c~rbs and inet&il 'c~rb %ar~ at'all
internal expansion joints. MFC
o Re~o~& raaius f0-Ziu~'.from inside curb
at the southwest corner. MFC
o Saw two curbs and apply sealant where
they meet inlet box.
o Seal all saw joints in street.
o RemOve .red wood tops and install
sealant..
MFC
Time-Tech
TimehTeCh
'Remove and reLset bricks (at'no~th
entrance to units) so that they. will
be level with paving - the bricks
cause wa%er to pond.
' Ti~e'Tech
Finish 2 ~wat'er valves. TheSe need
cleaning, leveling and pour concrete
around each.
Time-Tech
Time.-Tech, I~c.
2/20/86
o chec~ allbrOken curbs 'and
patch same.
Time2~ech
MFC C6~st~i0n's per~0nA~l~ili' start 'on th~ ~rst five items
listed and should be finished by Monday, February 24.
Ve~ truly yours,
Pe~te Nelson
PN/je
cc: Gu~nn '& Associates
Carlin Workman