LOW PRESSURE AIR TEST FOR GRAVITY ;
Test Procedures
~-
c
TESTING DIVISI~,'v ~'
Each section of sewer shall be tested between successive manholes.
Air shall be introduced into the pipeline unti14.0 psi gauge pressure has been reached. time the fk~
av shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi
minutes to allow the sir temperature to come to equil'brium with the temperature of the pipe walls. Pipe
shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line.
Pressure in the pipe shall not be allowed to exceed 5 psi.
After the temperature has stabilised and no air leaks at the phigs have been found, the air pressure shall be used
to determine that time lapse required for the air presswe to drop to 2.5 psi gauge.
If the time lapse required for the air pressure to decrease fmm 3.5 to 2.5 psi exceeds that shown in the following
table, the pipe shall be presumed to be within acceptable limits for leakage.
If the time lapsed is less than that shown in the table, the contractor shall make connections to reduce the leakage
to acceptable limits.
Line htformation Test Results Air Test Mandrel
Line Station to Station Pipe size L.F. Tested Time Passed ? Passed ?
X 5+77-5+67 8" 10 7Min. Yes Plug
X 5+67-3+16 8" 250 7Min. Yes Yes
X 3+16-0+50 8" 262 7Min. Yes Yes
Contractor: Murray Date: 4-16-07
Project: Bethel Road Job#:
Location:
Tested By: Ken Honeycutt
Inspector: Rick O'Dell City Of: Copnell
American
Rehab 8c Inspections, INC.
(214) 536-2915
I~~IANHOLE VACUUM TEST R
Test Procedures
Plug all manhole entrances and exits other than the manhole top acc -
mechanical pipeline plugs. Install the vacuum tester head assembly at the top
vacuum pump to test head and start pump. Open Inlet/outlet ball valve and ev
approximately negative 5 PSIG, 0.3 bar) Close vacuum inlet/outlet ball valve and
test period.
or
ia~10" Hg.
for specified
MANHOLE NUMBER HG.PSIG TIME PASSED
Line X
5+67 -10 45 Sec Yes
3+16 -10 45 Sec Yes
0+50 -10 45 Sec Yes
Line Y
Manhole# 1 -10 45 Sec Yes
Contractor: Murray Date: 4-16-07
Project: Bethel Road Job#:
Location:
~~ gyp, & !~`;`~'.~;. _,,,
~~~
SS rs
T'Z14-536-2~1 ~~ =''
TESTING DIVISIt~V ='
ing suitably sized
cess of manhole. A
Tested By: Ken Honeycutt
Inspector: Rick O'Dell City Of Copt~ell