MEETING MINUfES
Project
Project No:
Da11::
Purpose:
Persons n
Attendan:e:
Coppel Police & Fire Renovatlonsand Additions
20304
September 14,2006
Conslruaion Progress Meeting
Sreri Mlino, Project Manager
John Glover, Assis1antFire Chief
Tim OaleS, Assis1ant Fire Chief
Roy Oshom:, Potice Chief
Gal)' Nix, Deputy Police Chief
Keith Marvin
Lee Stone
Roger BU9iel~ Project Manager
Dan Young, Supcrntendent
Gal)' Beeman
City of CoppeD, Faciliti:s
Coppell Fire Department
Coppell Fire Depannent
Coppell Police Department
Coppell Police Department
City of CoppeD , Engineering
City of CoppeD , Building Inspections
Harrison, Harper Walker
Harrison, Harper Walker
Brinkley Sargent An:hitects
..,..iliillif.1....Il.
Reviewinl!: Lightning protection; masoruy fllL'lhing
~ Hardware; wood doors; a1wninwn framing
Statu s Log of Sup plem en ta I In structlons, P r oposa I R eq l esls an d Ch ange 0 rd er s
PR# I L Truncated domes- not accepted; 2. Millwork at fire tl1lining- $818, accepted; 3&4. Power at fire training-
$611, accepted.
PR# 2 Modify accessible ramp at southendoffire parl<:ing area. HWHpricing
PR#3 Fire Tl1lning- add another door at north side; modify ceiling HWH pricign
Pro res Statu s Lo :
Work In Progress: DellDliton at police- s. end; piers at fire; prep to pour parking at fire; sprinkler at police. Rain
on Monday has delayed trem a few days this week.
Next Two Weeks: Pi:~ at fife; mas>nry mockup; pour paving at fire and south of vehicular sall)pOrt at police.
Concrete sequence is currently planned to pour piers at fire; then do tre fire parking and fire
structural slab at one time [Sawrday pour because of large space required for the pump truck];
then do police piers; work on police garde beam9' slab.
Dan noted that currently they are approxirmtely I weeks behind schedule at Fire and one
week ahead of scredule at Police.
ACTION NEWBUSINESS
HWA ItemNo.9 9-14-06
Phasilg at Police. Roger will we taking people through the building and
proposing potential options! direaion for phlL'ling at the police facility. Sreri
noted that after a direction has been established a meeting to review temporatl)'
telephone and data service will need to be scheduled.
HWH Item No.8 9-14-06
Temporary Parking. At the solth end of the fire parkng lot that is currently
under corstru:tion Sheri requests that a pedestrian accessible ramp be installed
until tre feW rall1' is constructed.
BSNRG Item No.7 9-14-06
Site Utilities. Most site utilities have been installed. StiD need to issue
direction on eliminating urxlergrourrl electrical service to the fire addition.
Page 1 of2
t Sheri Moino.,:, PM 9~14-06.pdf
9-1-06
8-17-06
Item No.4. 9-1-06
8-17-06
',~^:'==-=^~:-:-,:: ~.,:~~ge21
I & 2.wat.er service taps have been installed.
3. Modifications to relocate gas and electrical Sl they don' go underground at.
the west drive area are currendy being engineered; a proposal request will
be iSllled in !he near future.
4. The site storm sewer- inlet east of the new fire parlting will not be modified
at. Ibis time; modifications to collect the parking area water in an inlet and
piping system will be part of the park project.
5. Paving. An additional twoindles ofcona-ete are being utilized instead of
using lime to stabilize the subbase.
The water rmin at Slulb side of fire didn' have valves so ITDdificat.ions will
need to be made to accommodate tying into that system while stiD leaving Oty
Ha II in servK:e.
I. Roger identified that rmirtaining water service D the police facility will be
a dlallenge; that. 1hey are still working on options! specifICS of when' how
long they will need to be wilbout water for a swilchO\lCr.
2. Fire officials desire that Ibe utilities on the west side not go under the
driveway. Sanitaty is being rerouted to the south approx. 80 additional feet
Gas will be rerouted tlrough the building. Electrx: selVice options are
being investi[!llted. Allowing for a fuue genentor for the training room
was also recently identified. It WlS determined that two meters will be
acceptable, ifthit rOUE is still taken
Ma S)n ry M ock ~p. Roger n01l:d Ibe lIIlckups will be installed Ibe later part of
next week, will be ready for review Ibe first of the following week [week of
II Sep].
Masonry lIIlck- up panels to be located at the southeast comer of each exilting
build ing; probably on a pallet. They will not remain long after approwl due to
the tight site reltraints.
OLD BUSINESS
Il<m No. 1
8-17~
Il<m No. 2
8.17~
Il<m No. 3
8.l7~
Il<m No. ,.
8-17~
Il<m No. 6
g-17~
SchBdu. afVahB. Resolved. Sch.dul. orvalu.s ",..iv.d.
PrqjresSchecklIe. Resdvcd Constnl cb on progrcss sch.dule ",..iv.d.
$Jlmltlals Resolv.d. Many submittals have already been submi ttcd ..d a", bci ng plOCes s..!;
process running smooth at th is time.
Lab. Resolv..!. Some scopes w.... ",due..! to h.lp the budaet.
Permit. Resolv..!. Building permit obtain.d.
The foregoing conveys 0\1' undersard ing of items discussed and conclusions reacred during this meeting. Minutes
shall be accepted as subrritted unl...s otherwise notified in writing within ten days. The next scheduled m:eting will
be ThuISday September2S" at 10:00 AM at the City Hall 20. floor conference room.
Slbmitted by,
<f.lIY Beeman, AlA
Brinkley Sargent Architects, Inc.
Copi es: ParticipmlS
Stuart EV.lCtt- BSA 20304 CI
Ronald G. G...man Billy James- SE
Mik. Wi !son- lNP Randall D..i d- BSA
Page 2 of2
Shoeri ~oin(). - site ol:lservatioins 9-14:Q~.pdf
fJc:l9El 1
ARCHITECT'S FIELD REPORT
OSrtiullcn:
ONNR I x AR:tf1H:T X I CCMRi'CTCR I X (Df06U.TANT I x
Coppell Pollee & Fn Renovations FR:lIB:;TI'O:
a:NTRPCrFCR
cay of Cop pel
P.oax 9$78
Cq:pSI, Teas 7ffi19
Gs1EraI CalsNtt:n
OA.TE:
20304
~14. :DC5
9'.30 PM
fRlECT:
OJ\NR
ThE
VE.A1l-ER
OElll'. sore nul
W~K IN PROGRESSI ceSERVATICJIlS:
Site utilities appear to have all been inslaDed
Gradi'lll compact'll fire parki'll area and prep. fa pavirll pOll'.
Demolition at soulh entance to Police.
Oher work was in plqlress lhat was net observed at lhis time.
ITEMS TO VERIFY:
INFCRMATION OR ACTION REQUIRED:
Need to relocate or remove the cabling at the soulh end cI the police building aiming from the rocl to the saJlh
parking area- Chief Nix is investigating if this is still in use.
ATTACHMENTS: phcxos
REPORT BY: Gary Beeman
20304 A4
Sheri Moino - site observatioins 9-14-06.pdf
e?lg~ 2
Site Observation Report- Coppell Police & Fire Renovations
Page 2
20304
',~age 3
J Sheri' Moino - site observatioins 9-14-06.pdf
Site Obse rva tion Report- Coppell Police & Fire Renovations
Page 3
20304