Loading...
MA FY 0506-LR060918Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 18 September 2006 PROJECT: City of Coppell Street Repair Project SUPPLIER: Pavement Services Job #05 -267, Coppell, TX LOCATION OF POUR SET 1: Paving patch at northbound lane of North Point Drive, approx. 30' -50' north of south entrance of Bldg. #200 and 0' -20' west of east curbline LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 2003 Cement Ticket No. Flyash Time Batched Sand Time Sampled 10:40am in. Concrete Temp. (ASTM C1064) 87 °F 1.0 in. Air Content (ASTM 02311 4.4% Water Unit Weight 1ASTM C138) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 572 4.50 7 09/25/06 136,200 4800 573 4.50 7 09/25/06 135,700 4820 574 4.50 28 10/16/06 165 5870 575 4.50 28 10/16/06 159 5640 28 -Day Average 5760 4000 TECHNICIAN: JPB (10:00am- 12:00n) DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas. Texas 75229 (214)•351 -6419 Fax (214) 351 -5148