Coppell Ind 2-LR061229 (2)Page 1 of 1
~ ~ ,. - -
Project Name Tradepoint Park
Building 2 Location Street
Date 12/29/2006 09:45 Direction Of Survey Upstream
City Coppell PO Number
Run Number Purpose Pre-Acceptance
Operator Name Mike DePaul Completed Yes
Comments
Asset ID Line SS-2 Pipe Size l0"
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 70.5 Year Laid 2006
Year Renewed Sewer Use Sanitary
Start MH Number 0+00 Start MH Depth
Start MH Location Start MH Notes
End MH Number 0+74 Plug End MH Depth
End MH Location End MH Notes
Amount of Flow Si ns Of Surchar a No
•
Media Number Truck Number 004
Contractor Name Southern Weather Light Rain
VCR Start Index 00:00:00 VCR End Index 00:02:37
American Rehab Cell 214-536-2915
and Inspections ice 972-488.3042
Dallas, Texas Fax 972-488-3142
12/29/2006
Page 1 of 1
Project Name:
~"` Date: 12/29/2006 9:45:00 AM
Location: Street
Total Distance: 70.5
Run Number:
Pipe Size: 10"
Tradepoint Park Building 2
Asset ID: Line SS-2
Start MH Number: 0+00
End MH Number: 0+74 Plug
Direction Of Survey: Upstream
Pipe Material: Polyvinyl Chloride
Manhole Number: 0+00
(3.Q~ -Begin Survey
(7Q5j -_End Survey
Total Distance: 70.5 ~ Manhole Number: 0+74 Plug
12/29/2006
Page 1 of 1
Project Name: Tradepoint Park Building 2
Date: 12/29/2006 10:06:00 AM Asset tD: Line SS-3
Location: Street Start MH Number: 0+00
Total Distance: 78.9 End MH Number: 0+77 Plug
Run Number; Direction Of Survey: Upstream
Pipe Siae: 8" Pipe Material: Polyvinyl Chloride
Manhole Number: 0+00
(3.0~ -Begin Survey
(7 8.9~___E n d __ S u_rv ey
Total Distance: 78.9 ~ Manhole Number: 0+77 Plug
12/29/2006