Loading...
Duke Lesley 2A-CS070521 ~~ THE.CITY.OF corrELL ~~!' ,v. ~ '* ~/vo r e _ ->'~:<J-~ X A I) \ 'b May 21, 2007 C. Jack Evans, P.E. Pacheco Koch Consulting Engineers 8350 N. Central Expressway, Suite 1000 Dallas, TX 75206 RE: Point West VII/Lot 2, Block A Construction Plan Review Comments Dear Mr. Evans: The City of Coppell has reviewed the plans for the referenced development and has the following comments to offer: I. Please provide a plat with the next submittal. Sheet C 1.2 2. It appears that at the northeast comer of the proposed building the fire lane goes into a reverse curve and narrows down to approximately 20 feet. Please reevaluate the fire lane configuration to ensure that fire apparatus can maneuver through the fire lane. Sheet C 1.4 3. There appears to be some confusion about the dimensions of the parking lot on the southeast comer of the proposed structure. Sheet C 2.1 4. Reference View 'A-A': Sheet C 3.2 shows the flow line of the 42" discharge pipe to be at 530, yet View 'A-A' shows the normal water surface to be at 526.5. Please review these elevations and make necessary corrections. Sheet C 3.1 5. The truck court areas, both on the north and south side of the proposed structure, are being used as potential detention basins. Please show the fire lanes in the drawing and provide additional information on how deep the water is being stored within the fire lanes when the truck courts are being used for detention. There could be a problem if the fire lanes are completely submerged. Sheet C 3.2 6. This comment pertains to the same comment as Sheet C 2.1. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 Sheets C 3.3, C 3.4, C 3.5 7. Please provide profiles for the on site drainage system. Sheet C 5.1 8. If you are going to request a waiver of lime beneath the pavement, a letter should be provided to my office for approval. Also, with the waiver of the lime, the City of Coppell requires an additional I" thickness on paving and a 4000-psi strength concrete. Sheet C 5.2 9. Please remove any detail that is contained within the City's standard detail set. The contractors are required to have a copy of the City's latest Standard Construction Details on site during construction. Also, Detail #8 needs to be corrected. Fire Department Comments Sheet C 1.1 1. Please ensure that there is adequate room in the 45.5-foot deep trailer-parking stalls so that the trailers and/or trucks do not hang over into the adjacent fire lane. Sheet C 4.4 2. The proposed location of the Fire Department connection should be relocated away from the driveway. Please coordinate with the Fire Marshal. 3. Please comment as to why there are no fire hydrants within 3-6 feet of the proposed fire lane on the south side of the building. 4. Ensure that the FDC is designed as indicated in our standards. For any questions concerning the comments generated by the Fire Department, please contact Tim Oates at 972/304-3512. For any additional clarification or discussion concerning the engineering comments, please feel free to contact me. Once these comments have been addressed, please resubmit this marked up copy along with two additional sets for a second review. s;;:, rUv- Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office Phone: (972) 304-3686 Fax: (972) 304-7041 Kgriffin@ci.coppell.tx. us