Vista Point 2R-LR070430
REED EnGinEERinG
GEOTECHNICAL AND G R CI LI P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 115
REG PROJECT NO. 13581
SAMPLE DATE: 04-23-07
TECHNICIAN: J. Ruiz
PAGE: 1 of 2
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 100'N, 70'E from SE bldg. corner
Paving: 50'S, 45'E from NE bldg. corner
Pavin : 190'S, 40'E from NE bid . corner
Mix Identification
23601504
ecified Stren
3600
3
Age@ Total Load
Date Tested Test Ibs.
04-30-07 7 101230
05-21-07 28
05-21-07 28
Hold H
3111 04-30-07 7 107810 3820
3111 05-21-07 28
3111 05-21-07 28
3111 Hold H
3112 04-30-07 7 104840 3710
3112 05-21-07 2B
3112 05-21-07 28
3112 Hold H
2
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REPORT NO. 115
REG PROJECT NO. 13581
SAMPLE DATE: 04-23-07
PAGE: 2 of 2
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Company!
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Air
Entrainment
6.0
6.0
5.9
Ticket
Number
13685685
13685694
13695712
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell!Mr. Keith Marvin