Loading...
Vista Point 2R-LR070430 REED EnGinEERinG GEOTECHNICAL AND G R CI LI P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 115 REG PROJECT NO. 13581 SAMPLE DATE: 04-23-07 TECHNICIAN: J. Ruiz PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 Ie Location Paving: 100'N, 70'E from SE bldg. corner Paving: 50'S, 45'E from NE bldg. corner Pavin : 190'S, 40'E from NE bid . corner Mix Identification 23601504 ecified Stren 3600 3 Age@ Total Load Date Tested Test Ibs. 04-30-07 7 101230 05-21-07 28 05-21-07 28 Hold H 3111 04-30-07 7 107810 3820 3111 05-21-07 28 3111 05-21-07 28 3111 Hold H 3112 04-30-07 7 104840 3710 3112 05-21-07 2B 3112 05-21-07 28 3112 Hold H 2 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REPORT NO. 115 REG PROJECT NO. 13581 SAMPLE DATE: 04-23-07 PAGE: 2 of 2 Submitted by: Extranet Distribution: (1) Jackson Shaw Company! Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Air Entrainment 6.0 6.0 5.9 Ticket Number 13685685 13685694 13695712 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell!Mr. Keith Marvin