Loading...
Vista Point 2R-LR070423 REED I EnGinEERinG GEOTECHNICAL AND TG R 0 U P ENVIRONMENTAL CONSULTANTS 1- . , CONCRETE CYLINDER TEST Vista Point II, P II S.H. 121 at Mac ur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 114 REG PROJECT NO. 13581 SAMPLE DATE: 04-16-07 TECHNICIAN: D. Decuir PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 Ie Location Paving: 8'S, 23'W from NW corner of Bldg. 6 Paving: 103'S, 19'W from NW corner of Bldg. 6 Pavin : 207'S, 49'W from NW corner of Bid . 6 Represented Desi n Information Source of Concrete Mix Identification ecified Stren Redi-Mix 23601504 3600 Age@ Total Load Date Tested Test Ibs. 04-23-07 7 79960 05-13-07 28 05-13-07 28 Hold H 2 2879 04-23-07 7 90270 3190 2879 05-13-07 28 2879 05-13-07 28 2879 Hold H 3 2880 04-23-07 7 84070 2980 2880 05-13-07 28 2880 05-13-07 28 2880 Hold H 2424 STUTZ DR. . SUI'E 400 . DA.LLAS TX 75235 . HI [214] 3505600 . f [214] 3500019 REPORT NO. 114 REG PROJECT NO. 13581 SAMPLE DATE: 04-16-07 PAGE: 2 of 2 Submitted by: Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Air Entrainment 5.5 2.7 3.4 Ticket Number 59006076 59006096 59006134 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin