Vista Point 2R-LR070423
REED I EnGinEERinG
GEOTECHNICAL AND TG R 0 U P
ENVIRONMENTAL CONSULTANTS 1- .
,
CONCRETE CYLINDER TEST
Vista Point II, P II
S.H. 121 at Mac ur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 114
REG PROJECT NO. 13581
SAMPLE DATE: 04-16-07
TECHNICIAN: D. Decuir
PAGE: 1 of 2
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 8'S, 23'W from NW corner of Bldg. 6
Paving: 103'S, 19'W from NW corner of Bldg. 6
Pavin : 207'S, 49'W from NW corner of Bid . 6
Represented
Desi n Information
Source of Concrete Mix Identification ecified Stren
Redi-Mix 23601504 3600
Age@ Total Load
Date Tested Test Ibs.
04-23-07 7 79960
05-13-07 28
05-13-07 28
Hold H
2 2879 04-23-07 7 90270 3190
2879 05-13-07 28
2879 05-13-07 28
2879 Hold H
3 2880 04-23-07 7 84070 2980
2880 05-13-07 28
2880 05-13-07 28
2880 Hold H
2424 STUTZ DR. . SUI'E 400 . DA.LLAS TX 75235 . HI [214] 3505600 . f [214] 3500019
REPORT NO. 114
REG PROJECT NO. 13581
SAMPLE DATE: 04-16-07
PAGE: 2 of 2
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Companyl
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Air
Entrainment
5.5
2.7
3.4
Ticket
Number
59006076
59006096
59006134
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin