Loading...
ST9902-LR070427 Drilled Core Compression Test Report .. eMJ ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: 687-5192-208 Moisture Condition at Time of Test: . '- Date Cast: Date Drilled: Drilled by: Type Auger Used: Date Tested: Age of Test: 11/7/2006 4/27/2007 Cap Form Core Barrell Moist Direction of Applied Load/Horizontal Plane of Concrete as Placed: Horizontal Nominal Max. Size of Aggregate: 4/27/2007 171 days Design Strength: 3600 psi 0.85 fc: nla 0.75 fc: nla CORE COMPRESSION TEST RESULTS Core/Cut Capped Core Length Length Length Diameter Area Maximum Correction Uncorrected Strength Fracture Number (in) (in) (in) (in) (sa. in.) Load (Ibs) lId Factor Strenath In....a. Type 1 9.00 7.00 7.20 3.70 10.75 46,545 1.95 0.996 4330 I C 4~1nJ 3 2 8.75 7.05 7.25 3.70 10.75 38,875 1.96 0.997 3620 ta61 0..1 2 3 8.75 5.05 5.30 3.70 10.75 39,780 1.43 0.952 3700 " 3520} 3 - Core Number . tion 1 Pavinq: West Sandy Lake Road, Sta. 7+00, Westbound Lane 9'-6" Left of Centerline 2 Pavinq: West Sandy Lake Road, Sta. 7+00, Westbound Lane 26'-6" Left of Centerline 3 Pavinq: West Sandy Lake Road, Sta. 7+00, Westbound Lane 38'-6" Left of Centerline ;/llU CMJ Engineering, Inc. R. Carl Lee, SET. Materials Testing Manager The test results presented in this report apply only to the specific samples, items, and area described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.