Loading...
SC-Lee E2-CS 901102 ,,--..,. .~ ALLEN PROPERTY CORPORATION 12770 COlT ROAD · SUITE 1115 · DALLAS, TEXAS 75251 Telephone 214.233.5771 I Fax 214-233-5881 r;:::.:;:-rr.' ';::'-[-r:J'-t. ,': , II D) Ls~.J ,.:.', i -'.~.';, NOV 5 1900 November 2, 1990 \ I! :j ii i : l ; I! ')1 L:- Alan D. Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: lee Elementary Drainage Proposal November 13, 1990 City Council Agenda Dear Mr. Ratliff: Thank you for the meeting of November 1, 1990 for the purpose of discussing the solution to the drainage problem occurring north of lee Elementary. After reflection on the meeting I thought It might be helpful for me to write this letter to be specific about the approvals we need from the City Council at the November 13, 1990 meeting on this Issue. Although the drainage proposal to be considered on November 13th was Initiated by the plat approval request of the Coppell Church of Christ, It Is Important that this drainage Issue be addressed and resolved not only In conjunction with the final plat approval for the church, but as a separate matter In and of Itself. As you know the Food lion grocery store plat is also in process, the Lee Elementary School expansion is imminent, and we are negotiating other development-possibilities In the same area; all of which are affected by the resolution of this drainage question. The specific approvals sought from the City Council on November 13th are: 1.) Dowdey Plan Approval - For the reasons stated above, It Is very Important that the City Council address this issue and make a decision on the acceptability of the drainage and utility development concept as reflected in the drainage and sanitary sewer extension plan for lee Elementary school prepared by Dan M. Dowdey and Associates dated August 1990, and which has been reviewed by your city staff (the -Dowdey Plan-). I've enclosed a copy of the Dowdey Plan with this letter. Please advise how many additional copies you need for the November 13th meeting. I understand that the City Council's approval of the Dowdey Plan on November 13th will be subject to city staff approval of the final engineering design of the construction plans. However, it Is necessary to have the approval of this preliminary plan at this time so we can (I.) proceed with prepar(1tlon of the construction plans, and (II) can assure the developers of other proposed projects In this area that there Is an agreed manner of handling the drainage across lee Elementary. 2.) Approval of Easements and Right to Construct - The approvals at the November 13th meeting needs to also provide that the city will allow Sandy Lake Corners Joint Venture, or its agents or Its assigns, to proceed with the construction of the drainage and utility facilities ,.-. ~ contemplated on the Dowdey Plan (after final engineering approval) upon delivery to the City of the drainage and utility easements from the school district to the city, across the lee Elementary site. There are two easements which are associated with the construction of the Dowdey Plan. A proposed form of both easements is enclosed, and both of these easements have been approved by the school district. The first easement, marked #1 A, Is for the drainage swale, and is wide enough to accommodate It's required 10:1 side slope on the school side, as well as the sanitary sewer extension. The one unique feature about this easement Is that it provides that the school district will be responsible to maintain the swale area, Instead of the city. This swale will be dry except during heavy rains, and will be easily mowed along with the play ground. The other easement is a standard city easement to provide for the extension for the 60. storm sewer and the construction of the enlarged inlet at the northwest corner of the school site. Since the easements will be actually granted to the city, the City Council approval needs to authorize us to enter upon the easements and do the construction work under the Dowdey Plan, once the city approves the final construction drawings. In order to comply with some of the agreements we have with the developers In the area, we will need after the November 13th meeting either a letter, resolution, or some other written evidence of the City approval (I) of the DOwdeY Plan (II) the easements, and (III) our right to enter upon the easements to perform the work after final engineering approval. If you have any questions please call. Yours very truly, Allen Property Corporation ~.. '. /,. .'\ t7(),1 \ I \ I . ,1, " .~ l . ;,i _ ,." '- -. r '0-'" . ,-,' ,; . \ ~.' . Michael R. Allen, President, Enclosure cc: Mark Wolfe Steve Goram, with enclosure Gary Sieb Buddy Echols Richard Dooley PP UTlllTES/ar/11.2.90