Loading...
Duke Lesley 3C-CS070517May 17, 2007 PK No.: 2768-06.384 Mr. Ken Griffin, P.E. CITY OF COPPELL Engineering Department 255 Parkway Boulevard Coppell, Texas 75019 Re: POINT WEST I -Request for Variance on Pavement Design Coppell, Texas GR1~1=1>M Dear Mr. Cielfirrr. On behalf of Duke Construction, we request that the City of Coppell grant a variance to the Subdivision Ordinance on the pavement design criteria for the Duke Lesley Addition Lot 3, Block C. Duke wishes to eliminate the use of lime stabilization on this project in order to save on cost associated with the pavement. In lieu of lime stabilization Duke will increase the concrete strength from 3,000 psi to 4,000 psi in both fire lanes and drive approaches, and the thickness of the fire lane will increase to seven (7}inches. In areas within the public right-of-way along drive approaches the subgrade will be composed of a minimum six (6)-inch thick flexible base with 6", 4,000 psi concrete. Thank you, for your consideration on this matter. If you have any questions or need any additional information, please contact me at your convenience. CJE/art 2768-80 enc. cc: Brian Pierce -Duke Construction o k. w S . z3 .