From: Ken Griffin
To: Melissa Waltzer
Date: 3/12/2007 10:55 AM ,
Subject: Re: DCC Wastewater System Analysis
CC: Scott Latta
Melissa
I have reviewed information previously provided by Scott Latta and spoken with my Utility Manager
concerning this request for information on the sewer lines around the DeForest Lift Station. There is a
24" flowing south to north that connects to 18" flowing north to south at a manhole on the west side of
Glen Lakes Drive. When the sewer line leaves the manhole it is a 36" line flowing west to east to the
DeForest Lift Station. Based on the information previously provided, I'm unsure what additional
information you need. If you could provide a sketch that shows the lines that you need additional
information on, then I could respond to this request.
As for as meeting, I have some time around 9:00 am on Friday 23rd. Let me know if that time works
for you.
Ken Griffin
»> "Melissa Waltzer" <mrw@freese.com> 3/9/2007 4:31 PM »>
Ken,
There is only one piece of information that we need to wrap up the project. Do you have plans for the line
between where the 24" and 18" interceptors meet near Glenn Lakes Drive and the Deforest Lift Station? This
interceptor was originally a 24" line, but I am not sure if it was replaced when the 18" line was put in.
We are planning to send you a draft memorandum the first part of next week and would like to meet to discuss
the results. What is your availability Wednesday through Friday of next week?
Thanks,
Melissa Waltzer
Water/Wastewater Engineering