From: "Doug Teter" <dteter @ebcc.com > f�
To: "'Ken Griffin "' <kgriffin @ci.coppell.tx.us>
Date: 5/14/2007 7:24 AM
Subject: RE: FW: Sandy Lake Road
CC: <spriddy @ebcc.com>
Good morning
I should probably have Steven get with someone and walk the panels to determine which we mutually agree
need repair.
As far as the topsoil, I believe the grass was growing in the medians when we sold the project, several years
ago. I also believe that what we were responsible for was the establishment of grass, not a nutrient -rich,
landscape- maintaining degree of special soil suitable for landscape planting. You are probably correct that we
will have issue with modifying that quantity.
I will still need your final quantities so I know where we are. I don't want to replace panels and then have another
"topsoil" issue surface. I thought our only issue was the panel replacement, and now here comes this topsoil
thing. We need to agree on FINAL quantities of work completed and then we will undertake the issue of the
panels.
Thanks
Doug Teter
Ed Bell Construction Company
From: Ken Griffin [mailto :kgriffin @ci.coppell.tx.us]
Sent: Tuesday, May 01, 2007 8:15 AM
To: Doug Teter
Subject: Re: FW: Sandy Lake Road
Doug
It went through last time. I just received information from our evaluation on Friday. There are 23
panels that need either complete or partial replacement. 13 are on the westbound side and 10 are on the
eastbound side.
As for as quantities, topsoil is the one that will be an issue. None of the "top soil" placed in the median
was acceptable because it consisted of rock, debris and other items that are not top soil. It all had to be
removed and replaced when the landscaping was placed in the median of Sandy Lake.
Please provide a timetable when the work will be started so I can schedule an inspector. Garreth is
working under an as needed contract and is not always available. With advance notice on the schedule,
I will try to ensure he is available.
Thanks
Ken Griffin
>>> "Doug Teter" < dteter @ebcc.com> 5/1/2007 6:28 AM >>>
I guess it didn't go through last time.
Doug
From: Doug Teter [mailto:dteter @ebcc.com]
Sent: Tuesday, April 17,.2007 2:41 PM
To: 'Ken Griffin'
Cc: 'Steven Priddy'
Subject: Sandy Lake Road
Good afternoon Ken
I haven't forgotten about our issue(s) at Sandy Lake. It just took me a little bit to get up and get it looked at.
We feel there are 12 -15 panels that should probably be replaced in order to get everyone satisfied with finaling
the project. We are also unsure, since Mr. Weber's departure, where we stand quantity -wise with you guys.
Would you please send me what you think you have paid and what remains to be ironed out so we can move
forward with getting this off everybody's books?
My fax is 281 - 232 -6300. Thanks
Doug Teter
Vice President
ED BELL CONSTRUCTION COMPANY
dteter @ebcc.com
http : / /www.edbeliconstruction.com