Loading...
Amegy Bank-CS070105Ken Griffin - RE: Permit Application From: "MSutton" <MSutton@jonescarter.com> To: "Ken Griffin" <kgriffin@ci.coppell.tx.us> Date: 1/S/2007 10:21 AM Subject: RE: Permit Application CC: "Paula Crocker" <PCROCKER@ci.coppelLtx.us>, "Rhonda Brothers" <RBROTHER@ci.coppell.tx.us>, "SRockenbaugh" <SRockenbaugh@jonescarter.com> ..._._._._ .............._._ .......... ... Mr. Griffin, I apologize for the misunderstanding. At this time we are only planning on submitting the site plan. I am requesting the permit application in order to be prepared if/when the site plan is approved. I would like to review the application to know and understand what information I need to obtain prior to submitting. Knowing this, could you please have Rhonda forward me a electronic copy of this document? Again I apologize for any inconvenience this may have caused you and your staff. Thank you, Marto A. Sutton Design Engineer msutton@jonescarter.com JUNES 8~ CARTER, i~C ENGtNEERS•PLANNERS•SURVEYORS 3030 LBJ Freeway, Suite 910 Dallas, Texas 75234-7747 Tel 972-488-3880 Ext. 232 Fax 972-488-3882 Smart Engineering. Smart Solutions.T^^ www.jonescarter.com __ From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Friday, January 05, 2007 9:56 AM To: MSutton Cc; Paula Crocker; Rhonda Brothers Subject: Re: Permit Application Ms. Sutton Rhonda works for me and, as you and I discussed this morning, you do not need to provide a permit or full construction plans at this time. At this time, you only need to provide a site plan that shows where you wish to connect to Hackberry within the City of Coppell.. This is what we discussed in our 12/19/2006 meeting. Once I have the site plan, I will discuss the proposed connection to Hackberry with the Manager's office and our legal counsel I will then be able to respond to you concerning the proposed connection to Hackberry. If you have any additional questions, feel free to contact me. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgriffin aci.coppell.tx.us »> "MSutton" <MSutton@jonescarter.com> 1/5/2007 9:42 AM »> Rhonda, I haven't received the permit application we discussed this morning. I just wanted to send you a quick email to make sure you have the correct email address. Thank you and let me know if you have any questions. Thanks, Marlo A. Sutton Design Engineer msutton@jonescarter.com JONES & CARTER, Ir~c ENGINEERS•PLANNERS•SURVEYORS 3030 LBJ Freeway, Suite 910 Dallas, Texas 75234-7747 Tel 972-488-3880 Ext. 232 Fax 972-488-3882 Smart Engineering. Smart Solutions.T"" www.jonescarter. com