WA9601B-CS 991207 SHIMEK, JACOBS & FINKI,EA, L.L.P.
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CARTER, P.E.
GARY C. HENDRICKS, P.E. December 7, 1999
1. c. FINKLEA, P.E.
PAUL A. CARLINE, P.E.
MATT HICKEY, P.E.
Fox Contr~/oors, Inc.
Po. st Of 0 e Box 951
RM2~~d;Z2~se R7o6a0d65Water Line
Final walk-through and Change Order Number 3
Gentlemen:
We are in receipt of the construction record drawing mark-ups provided by your project superintendent and are
now in the process of producing the final construction record drawings to be delivered to the City of Coppell.
As such, the City has scheduled a final walk-through for Wednesday, December 14, 1999 at 2:00p. m.,
starting at the Wagon Wheel Ranch Elevated Storage Tank.
We are also enclosing five copies of Change Order Number 3 to your contract with the City for the
construction of this project. Change Order Number 3 covers the compensation for delays experienced while
easement issues were resolved. If the change order is acceptable, please sign and return all five copies to this
office.
Sincerely yours, /
"~"~'~ ' ~ ~' / P . E .
Enclosures
cc: tl~. Kenneth M. Griffin, P.E.
Mr. Larry Davis
Mr. Glenn Hollowell, P.E.
j:\clerical\coppell\96~ 150\letters~const\k\~nal inspection.doe