Braewood North-CS070531DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM.• Braewood North (The Gables) Lot 1, Block A, Minor Plat, to establish
a building site, fire lanes and easements to allow the development of a
two-story office/retail building containing 11,000-square-feet on 41,084-
square-feet of property located on the south side of Sandy Lake Road,
approximately 154 feet west of Heather Glen Drive, at the request of
Peter Buell, being represented by Bob Anderson, Plan Solutions
Architects.
STAFF REP • Gary Sieb PROJECT ID# MP-07-0048
DRC DATE: May 31, 2007 and June 7, 2007
CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
COMMENT STATUS: /PRELIMINARY ~A~b Ii"~~~
1. Please provide Drainage, Water and Wastewater plans.
2. Are you proposing to pick up the drainage onsite?
3. Provide preliminary utility plan showing a DDC in a 20' x 20' easement.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Braewood North The Gables Lot 1 Block A Site Plan to allow the
development of a two-story office/retail building containing 11,000-
square-feet on 41,084-square-feet of property located along the south
side of Sandy Lake Road, approximately 154 feet west of Heather Glen
Drive, at the request of Peter Buell, being represented by Bob
Anderson, Plan Solutions Architects.
STAFF REP.: Gary Sieb PROJECT ID# SPA-07-0047
DRC DATE: May 31, 2007 and June 7, 2007
CONTACT.• Kenneth M. Grif_fn, P.E., Dir.of En,~ineerin~/Public Works 972/304-3686
COMMENT STATUS: /p~~]MINARY ~ALAb ~B
1. Use stamped concrete at the driveway.