DR8801-CS 880901 'i' ( ()Sd lil, IN( ~ber 1, 1988 Minya~d Food Stores, Inc. Ii.-/t-~--~//~ 777 Freeport Parkway Re: Beth~Road Drainage - Postal Site ~, .\ D~r Mr. Min~.rd: Bids were recefVed on August 26, 1988 for the construction of the box culvert and appurtenances along Bethel Road and Freeport. Enclosed is a bid tabulation of all bids received. Buckelew Construction Company was the low bidder with a bid of $473,929.50. Enclosed is a copy of their proposal which shows all the unit prices. In checking references, this firm received good recommendations. This bid is approximately $186,000 lower than what was proposed by Uvalde Construction Company, the contractor for the Royal Lane project. The extra effort to re-advertise the project appears to have been well worthwhile. The estimated probable cost for the project is $600,000 which includes construction, engineering, surveying, inspection, testing and contingencies. Therefore, your portion should be around $350,000. Since the proposed escrow agreement states that Minyards' portion is "up to a maximum of $375,000", it is recommended that the escrow agreement be executed as presented. This will provide a safety cushion in the event that unexpected costs occur while taking the Minyards' waterline out of service temporarily and to allow a little additional funding for landscape, which is yet to be approved. It is our understanding that you are in receipt of all other necessary documents, as transmitted by Mr. Ratliff on August 19, 1988. It is our goal to have the contract awarded to Buckelew Construction Company at the September 13, 1988 City Council meeting. Mr. Bob Minyard September 1, 1988 Page 2 If you have any questions about the bids, please call. We appreciate the cooperation extended by you and your staff throughout this process. Sincerely, H. Wayne Ginn, P.E. cc: Alan D. Ratliff Russell Doyle Larry Jackson