Duke Lesley 2A-CS070524 (2) Pacheco Koch ' cl "llCJ EII,!lller::;' '3 May 24,2007 PK No.: 2768-07.063 Mr. Ken Griffin, P.E. CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 ~~ Re: POINT WEST VIII LOT 2, BLOCK A Construction Plan Review Comments Coppell, Texas Dear Mr. Griffin: This letter is to notify you that the enclosed Construction Plans have been revised in accordance with your May 21,2007, Review Memorandum. The following items have been addressed as per the referenced review: GENERAL COMMENTS · 1. Please provide a plat with the next submittal. Response: A plat has been provided. Sheet C 1.2 . 2. It appears that at the northeast corner of the proposed building the fire lane goes into a reverse curve and narrows down to approximately 20 feet. Please reevaluate the fire lane configuration to ensure that fire apparatus can maneuver through the fire lane. Response: The fire lane width has been increased. Sheet C 1.4 . 3. There appears to be some confusion about the dimensions of the parking lot on the southeast corner of the proposed structure. Response: Dimensions have been modified for clarity. Sheet C 2.1 . 4. Reference View 'A-A': Sheet C 3.2 shows the flow line of the 42" discharge pipe to be at 530, yet View 'A-A' shows the normal water surface to be at 526.5. Please review these elevations and make necessary corrections. Response: Elevations have been reviewed and corrected. Mr. Ken Griffin May 24,2007 Page 2 Sheet C 3.1 . 5. The truck court areas, both on the north and south side of the proposed structure, are being used as potential detention basins. Please show the fire lanes in the drawing and provide additional information on how deep the water is being stored within the fire lanes when the truck courts are being used for detention. There could be a problem if the fire lanes are completely submerged. Response: Fire lanes are now shown. The maximum design detention depth for the fire lanes is 6 inches. Annotations indicating the design depth have been added to the plans. . 5a. Provide calculations for allowable discharge from truck court detention. Response: Allowable discharge flows from the site area based on the Duke-Lesley Tract infrastructure plans. Strom drainage improvements associated with those plans have been approved by the city and are currently under construction. Sheet C 3.2 . 6. This comment pertains to the same comment as Sheet C 2.1 Response: Please refer to response to comment number 5. Sheet C 3.3, C 3.4. C 3.5 . 7. Please provide profiles for the on site drainage system. Response: Profiles have been added. Sheet C 5.1 . 8. If you are going to request a waiver of lime beneath the pavement, a letter should be provided to my office for approval. Also, with the waiver of the lime, the City of Coppel! requires an addition 1" thickness on paving and a 4000-psi strength concrete. Response: A waiver request letter shall be provided. Concrete thickness and strength requirements have been noted. Sheet C 5.2 . 9. Please remove any detail that is contained within the City's standard detail set. The contractors are required to have a copy of the City's latest Standard Construction Details on site during construction. Also, Detail #8 needs to be corrected. Response: Details included in the City's standard detail set have been removed. Detail number 8 has been corrected. FIRE DEPARTMENT COMMENTS Sheet C 1.1 . 1. Please ensure that there is adequate room in the 45.5-foot deep trailer-parking stalls so that the trailers and/or trucks do not hang over into the adjacent fire lane. Response: A typical trailer is 54 feet long with 12 feet between the end of trailer and the rear wheels: Including overhang, 42 feet of stall depth are required to keep trailers out of the fire lane. Also, a 12 inch curb is proposed for the trailer stalls. Mr. Ken Griffin May 24,2007 Page 3 Sheet e 4.4 . 2. The proposed location of the fire Department connection should be relocated away from the driveway. Please coordinate with the Fire Marshall. Response: The Fire Department Connection has been relocated. . 3. Please comment as to why there are no fire hydrants within 3-6 feet of the proposed fire lane on the south side of the building. Response: Fire hydrants have been added. . 4. Ensure that the FOe is designed as indicated in our standards. Response: Comment noted. If you have any questions or need any additional information, please call at your earliest convenience. ?ill t~ William K. George, P.E. WKG/art 2768-86