Coppell Trade 2-CS070524OOM ON=
HOLT LUNSFORD
C O M M E R C I A L
^c 0 0 r
/ May 24, 2007
City of Coppell
Attn: Larry Davis
Building Engineering
255 Parkway Blvd.
P.O. Box 478
Coppell, Texas 75019
Re: Coppell Trade Center, Phase. II
Dear Sir:
I wanted to confirm for you that the ownership for the above mentioned project has
committed to complete all the stonework facades for the above mentioned project
within the next thirty days.
You may have noticed already that Greater Metroplex Interiors has begun work on
the stonework and most likely will be complete within the next 30 days. We
:respectfully request the stonework portion of this project not to hold up building
finals approval for the balance of the project.
As always feel free to call me with any questions.
Thank you.
Sincerely,
V
fn ewman
Vice President Construction
y �
KN /mk
5055 Keller springs Rd. . Suite 300 Addison, Texas 7500 972- 241.8300 Fax 972.241.7955 • holdunsford.com