Loading...
CF-Town Center Plaza-CS070515 CITY OF COPPELL CONSTRUCTION CONFERENCE MINUTES Date of Meeting May 15, 2007 Project Title Coppell Town Center Plaza Project Location Town Center Agency City of Coppell ~ lZo 1. The arties in attendance were as follows: ~) p Coppell Parks Northstar Northstar Coppell Building Inspections Coppell Engineering Coppell Parks Brad Reid 972-462-5.100 Michael Heimlich 817-244-8885 Jim Cowart 817-223-4992 Lee Stone 972-304-3510 Larry Davis 972-304-3684 Guy McLain _ 972-462-5125 2. Submittals: Status as is documented in various correspondence 3. Project Schedule: Hydromulching is to be done prior to September 1 Northstar to revise schedule to reflect completion of South end of project first, with North end around Sundial to be completed later. Schedule to indicate the transfer of site access to northeast side of Town Center Building. Northstar to provide a formal request for such revised site access. 4. RFI's #1 -Change of the pier design -finalized #2 -Justice Center Parking lot alignment finalized #3 -Stage area at rear of Town Center. Northstar proceeding with removal of patio and steps #4 -Grades at south end of project to be confirmed -finalized and installed #5 -Question regarding the routing of the existing building electrical service and where to tie in? Northstar to confirm elevation and alignment, Halff to respond #6 -Sundial Foundation - uplights are shown to be installed in 2 of the beams. Halff responded with final location #7 -Optic Fiber line at the Fountain is located within the pour of the Fountain foundation. Decided to leave Fiber in place, sleeve around it, pour bottom of footing around sleeve #8 -Verification of elevations of screening and dumpster walls -finalized 5. Sunports International has submitted information to Halff to be considered as approved equal for shade structure. Halff approved, awaiting shop drawings Page 1 of 2 6. Centex has located trees for project, city has approved, authorized tagging. 7. Northstar putting together Change Order No. 1 for new lighting at the north end of the Justice Center Elevation transitions at south end of site are problematic-City to contact YMCA to see if solution can be worked out. YMCA has agreed to let city slope to grade. 9. Northstar has questions about the layout of the Sundial Plaques, conflicting with other elements of the project 10. Next Meeting will be held on May 29, 2007, 9:OOam Page 2 of 2