Jessica
I've included information from Northlake concerning sewer usage. I'm not sure if you ever made
contact with them, as I requested, so I don't know how this information impacts your analysis.
Brenda Spinelli Project Manager for AGUIRRE + PARSONS and Wade Beasley
Discipline Director for Jocobs have requested that North Lake College
provide you the following information for the Coppell campus location.
We estimated that we use 32.8 gallons per square foot per year at the
main campus. The basis for this estimate comes from the 2006 actual
meter water usage minus the aquatic center meter usage (they use about 2
million gallons a,year). The total was divided by the gross square foot
minus the Library square oot (because it is on a separate meter). We
searched the Internet for some standard school use rates but couldn't
fnd anything that compared to us. Therefore. if you use the 32.8
gallons per square foot times the North Campus approx. 35.000 gross
square foot. we would use approx. 1.148.000 gallons of water a ,year.
Please contact us i~,you have any questions.
Steve Schellenber~
Assistant Director
Facilities Services
North Lake College
5001 N. MacArthur Blvd.
Irving. TX 75038
phone: 972-273-3177
fax: 972-273-3354
email: SSchellenberg(a~dcccd.edu
Please let me know as soon as possible how your study fits with this information.
Thanks
Ken Griffin
»> "Jessica Brown" <JLB@freese.com> 4/11/2007 4:45 PM »>
Ken,
I apologize that this has taken longer than we originally planned - we ended up getting some decent
usage data to use as a reference for potential flows from the College. The more we were looking into
the proposed flows and options, we saw some significant surcharge issues and wanted to make sure we
had all of our bases covered with the options we recommended. Please review the attached
file://C:1Documents%20and%20SettingslPCROCKER\Local%20Settings\Temp\GW} 0000... 5/30/2007
Page 2 of 2
memorandum and let us know when you are ready to meet to discuss the results.
Jessica Brown, P.E.
Water & Wastewater Engineering
Freese & Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, TX 76109
p (817) 735-7406
f (817) 735-7492
This electronic mail message is intended exclusively for the individual or
entity to which it is addressed. This message, together with any attachment,
may contain Freese and Nichols, Inc. confidential and privileged information.
The recipient is hereby put on notice to treat the information as
confidential and privileged and to not disclose or use the information except
as authorized by Freese and Nichols, Inc. Any unauthorized review, printing,
retention, copying, disclosure, distribution, retransmission, dissemination
or other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited.
If you received this message in error, please immediately contact the sender
by reply email and delete all copies of the material from any computer.
Thank you for your cooperation.
file://C:\Documents%20and%20Settings\PCROCKER1Local%20Settings\Temp\GW} 0000... 5/30/2007