Loading...
CF-Town Center Plaza-CS070313CITY OF COPPELL ~i1~ ~ ~ ~ o ~~ / d7 CONSTRUCTION CONFERENCE MINUTES Date of Meeting March 13, 2007 Agency City of Coppell Project Title Coppell Town Center Plaza Project Locatio wn Center The parties in attendance were as follows: Coppell Parks Brad Reid 972-462-5100 Northstar Michael Heimlich 817-244-8885 Northstar Jim Cowart 817-223-4992 Coppell Building Inspections Lee Stone 972-304-3510 Coppell Engineering Larry Davis 972-304-3684 Coppell Parks John Elias 972-462-5115 Halff Associates Francois Dekock 214-346-6243 Coppell Parks Guy McLain 972-462-5125 2. Submittals: Submittal # 16050.01, Sequence #5 -Returned, to be resubmitted Submittal # 02630.01, Sequence #8 -Returned, approved Submittal #02630.02, Sequence #10 -Returned, approved Northstar to formalize Schedule of Values. Ok as currently proposed Cen-Tex Seeding -Names and contact information of references still needed; all plant names to include botanical name. Northstar requested that the concrete submittal be returned ASAP as will be holding up the proposed pour of sidewalk on north-west side of project Project Schedule: Hydromulching is to be done prior to September 1 Northstar to revise schedule to reflect completion of South end of project first, with North end around Sundial to be completed later. Schedule to indicate the transfer of site access to northeast side of Town Center Building. Northstar to provide a formal request for such revised site access. 4. 5 6. RFI's #1 -Northstar wants to have the flexibility of changing the pier design for the screening walls and retaining walls due to high ground water. Determination will be made after drilling is completed for the Sundial #2 -City needs to verify the location of the eastern alignment of the proposed southern Justice Center Parking lot. Northstar and City to make determination as to how irrigation wires will be taken from the west side of the building, to the garden on the east side Sunports International has submitted information to Halff to be considered as approved equal for shade structure. Halff reviewing Page 1 of 2 7. City will not authorize the proposed change to the fountain design. Construct as designed and awarded 8. Discussed size and quantity of trees. In particular, the Texas Ash. Cen Tex to provide 9-4" trees as outlined in addendum # 1 9. The existing lighting bollards (3) at the north end of the Justice Center shall be removed by Northstar along with the sidewalk demo. Halff will propose a new lighting design for this area of the project. 10. Mark McGraw - Halff Engineer to verify USGS benchmark elevations for project. 11. Mark McGraw preparing a response regarding top of wall and bottom of wall elevations reflected on the drawings for the retaining wall 12. Northstar still working on the ultimate solution for construction of the concrete structure of the Sundial. 13. Northstar reports that the steps at the rear of Town Center have been sawcut, but it appears that the foundation for the building extends into this area. They have temporarily stopped work for direction from City/Halff 14. Recessed to the project site to discuss the forms erected for the sidewalk pour on the north end of the project. Recommendations were received by Northstar regarding two ramps and sidewalk alignment. Page 2 of 2