Loading...
Hard 8 BBQ-CS070607June 7, 2007 Rob Wilson ATA Construction 2199 E Dove, Suite B Southlake TX 76092 Fax: 817- 329 -0631 RE: Hard Eight BBQ, Crescent Addition/Lot 1 Block A Final Walk -thru Dear Mr. Wilson: Please be advised that a walk through inspection has been scheduled for Tuesday, June 12, 2007 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call me at your earliest convenience. Garreth D. Campbell, Sr. Construction Inspector Mobile: 469 576 -7708 Fax: (972) 304 -3570 T H E •C 1 T Y 0 F COPPELL cc: Ken Griffin, P.E., Director of Engineering /Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Jimmy Humphrey. Jackson Construction C. Jack Evans, P.E., Pacheco Koch 255 PARKWAY P.O.BOX 9478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673