Loading...
DR8802-CS 920424 (2) ~OPP~.;. P~E..IC ~01~S ~ATEs April 24, 1992 TOs Larry Davisv Construction Inspector FltO~s Rey Gonzales, Streets Superintendent~ REs Walk Through - Kaye Street Drainage The following it~- were found to be deficient in our walk through of this proJect~ · Fill and compact settl~m__ent around inlets · Grout connection of 24" RCP inside of existing inlet on Spanish Moss ·Clean up street where debris has been tracked and where materials were stockpiled · * Notes Manufacturer's information on inlet grates needs to be submitted with "as builts" Please advise when contractor has comp%eted the corrections. RG/dm KAYESTR. RG