Loading...
Hard 8 BBQ-CS070612Please refund $9,082.50 to: Coppell Hard Eight Ltd. 1091 Glen Rose Rd Stephenville TX 76401 Attachments T H E C 1 T Y O F COPPELL MEMORANDUM TO: Jennifer Miller, Finance Director FROM: Ken Griffin, Director of Engineering /Public Works C1 DATE: June 12, 2007 REF: Refund to Hard Eight Barbecue Two fire line meters were shown on the plans for this project when fees were collected on July 19, 2006. We collected the check for all the fees on that date, which included the two meters at $4,541.25 each (see attached). We then ordered the two meters (DDC's); however, they elected to use their own DDC /Vault assemblies instead, so they are due a refund in the amount of $9,082.50. cc: Glenn Hollowell, Assistant Director of Public Works MEMORANDUM T 11 E C 1 T Y 0 F COPPELL Date: June 11, 2007 To: Ken Griffin, P.E., Director of Engineering/Public Works From: Glenn D. Hollowell, P.E., Assistant Director of Public Works RE: DDC's for Hard 8 BBQ Ken: Hard 8 BBQ furnished their own DDC's and vaults. They furnished the DDC/Vault combination assemblies. We did order DDC's for them but, they decided to use the vault combinations instead. Any funds that were collected for the DDC's should be refunded to Hard 8. If you have any questions or concerns regarding this issue, do not hesitate to contact me. PROJECT: Crescent Addition, Lot 1, Block A DATE: 1/18/2006 DEVELOPMENT FEE WORKSHEET Water Impact Fee: Domestic Meter(s): 1 2 inch 8 ESU's Irrigation Meter(s): 1 2 inch 8 ESU's 0 0 ESU's Fireline Meter(s): 2 8 inch 2.5 ESU's Total 18.5 ESU's $280.00 ea. $5,180.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total 4 Connections $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 1 Domestic Meter(s) $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total 1 Irrigation Meter(s) $204.34 Total 0 Additional Irrigation Meter(s) $0.00 Total 2 Fireline Meter(s) $4,541.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 1 Meter(s) $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total 3 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 $280.00 ea. $2,240.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total 1 Connections $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 1 Lots $50.00 ea. (100% due prior to issuance of building permit) Page 1 $200.00 $204.34 $204.34 $0.00 $9,082.50 $90.00 $50.00 PAY AMT .TAY, 7/3- 1 ,N,E THE ER 0 rO 0 L00 Lo CASH RECEIPT Received From P.ddrasn Cre_s LOAN, ipn eLk 4„L te^, 5/8,0 e 2 4 L L L9035751: COPPELL HARD EIGHT LTD 1091 GLEN ROSE RD STEPHENVILLE, TX 76401 DATE L /00 L6500 066986 tg/ 1 331 1001 11 2C0(e) 88-357/1119 51 4 c-, IR Cce 1 4 i T V IT1 FORST FINANCIAL 1 BANK- P 0 Box 998, Stephenville, Texas 76401 254-9 620 ti OR ...1—.4,1S F z Id tf R S