DR8802-CS 920411 RHODE CONSTRUCTION CO.
ALI. TYPES PIPELINE CONSTRUGTION "
2031 JOHN WEST ROAD SUITE 121 ~ 214-327-7944 DAI. LAS, TEXAS 75226
PROJECT:"
ESTIMATE NO.: 4 & FINAL
PERIOD: 4/11/92 TO 5/2/92
TOTAL UNIT TOTAL
ITeM DESCRIPTION COMPLWfk-~ UNIT PRICE DUE
1 18" RCP 201LF $107.21 $21,549.21
2 24" RCP 1173 LF $113.18 $132,780.14
3 12" X 12" INLETS 23 EA $250.00 $5,750.00
4 TPJ~NC~ SAFETY 1374 LF $0.12 $164.88
5 CONNECT TO EXIST. 27" 1 EA $285.00 $285.00
6 PAVE R&R SIDEWALK 80 SF $2.75 $220.00
7 SOD 2480 SY $3.98 $9,870.40
TOTAL WORK COMPLETED TO DAT~ $170,599.63
LESS 10% RETAINAGE $0.00
AMOUNT DUE $170,599.63
LESS PREVIOUS PAYMENTS $153,253.11
AMOUNT DUE THIS ESTIMAT~ $17,346.52