Loading...
Service Star-CS070620T H E G I T Y - O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal From: Larry Davis, Construction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 Date: June 20, 2007 RE: WALK -THRU INSPECTION r Vista Point II, Lot 4/Phase 2 01 / A final walk -thru for paving, utilities and drainage on the referenced project has been scheduled for: Thursday, June 21, 2007 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Tim Robitaille, ICI fax #972 - 459 -7683 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"