Loading...
ST9905DR-LR060113i,.~ 'T' Construction Materials Testing and Environmental Consulting 'Texas CIVI'T, ~mc~~ 5~j2 10044 Monroe Drive Dallas, Texas 75229 , • (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: January 13, 2006 Date Concrete Placed: DeCembeC 16, 2005 Standard 6"x 12" Client City Of COppell Area 28.27 Square Inches Prq~ect: Bethel Road I Drainage Project Concrete Report No.: 1 Phase A (ST 99-OS) Contractor: Project No.: 205-0202 Concrete Supplier and Plan t: LMC 3 Location of Placement: CU1Vert MATERIALS Source/ SSDBathwt5. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 01:04 pm Cement: Time Sampled: 01:54 pm Sample Location: 65' S. & 6' E. of SE corner of Bethel Rd. & Ply Ash: Freeport Coarse Aggregate: Truck/Ticket No: 964/3206231 Intermediate Aggregate: Temperature: Pine Aggregate: Ambient Range: 44°F Concrete Range: 56°F Admixtures: Slump Range (inches): 4" 1 Weather Conditions: Cloudy 2 Time Started: 12:00 pm Added Water: 0 gallons Time Completed: 02:30 pm Sample Air Content (%): 4.75% Total Cubic Yazds Placed: ]0 Rennired Strenvth (I.hc /cn in 1' 3600 Specimen Number Measured Slum (in. Age Da s Date Tested Total Load Lbs. Compressive Strength Lbs./S .In. Remarks BET 1 7 12/23/05 98,140 3,470 BET 2 28 01/13/06 127,600 4,510 BET 3 4 28 01/13/06 144,920 5,130 BET 4 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: 1G ASTM C-31,C-39,C-143 nless Noted Otherwise Remarks and/or Distribution: cc: Ms. `Suzan C. Taylor -City of Coppell t Texas CMT Znc Reviewed by: 1 '- _ _ All IC[IC6 and reports arc for tM: occlusive use of the client [o whom they are addressed and shall not be rgiroducod without the full approval oFTexas CMTs, Inc. Tlie use of our name must receive our poor wrinen apprm~al. Our Ietmrs and rcpor, apple only to the sample tesad and/or observed and aze no[ necessarily utdicative of the quantities of apparently identical or sunilar products.