ST9905-CS041202
Ken Griffin - Bethel Road Update Request
From: "Jarrell, Albert" <albert.jarrell@hillwood.com>
To: 'Ken Griffin' <kgriffin@ci.coppell.tx.us>
Date: 12/2/2004 9:17 AM
Subject: Bethel Road Update Request
Ken,
As you may remember, we own the Tradepoint development (Mohawk Building) on Bethel Road. We've been
working with Suzan Taylor, and I think we've given you all of the R.O.W. and easements you required. I've been
asked about the Bethel Road improvements schedule.
I found this on your website today:
ST 99-05 BETHEL ROAD I (West City Limits to Freeport Parkway)
A design contract for Bethel Road was awarded to TranSystems Corporation on February 13, 2001. The
project consists of the widening of the existing 2-lane asphalt road to a 4-lane divided roadway. The
project also includes a detailed drainage study to determine how to accommodate the future drainage
associated with the large undeveloped property at the southwest corner of Royal Lane and Bethel Road,
and design of the required drainage improvements. The project is in the design phase and construction
plans are 800/0 complete. Coppell is currently acquiring the necessary right-of-way. Construction of the
improvements is anticipated to start in the 2nd Quarter of 2005.
Is there more current information you can share with me about the schedule?
Thanks,
Albert Jarrell
Development Director
Hillwood Investment Properties
Three Lincoln Centre
5430 LBJ Freeway, Suite 800
Dallas, Texas 75240
972.201.2971 direct
972.201.2989 fax
214.616.3153 mobile
al bert.jarrell@h i Ilwood. com
www.hillwoodinvestmentproperties.com
www.hillwood.com