(6/25/2007) Ken Griffin - RE: Minyards (2)
5/2007) Ken Griffin - RE: Minyards
Pa
From:
To:
CC:
Date:
Subject:
"Bruce Barclay" <Bruce. Barclay@dukerealty.com>
"Bruce Barclay" <Bruce. Barclay@dukerealty.com>, "Suzan Taylor" <staylor@...
"Kenneth M. Griffin (E-mail)..<kgriffin@ci.coppell.tx.us>. "Chad A. Jack...
10/20/2005 1 :09 PM
RE: Minyards
Suzan,
I've attached a new letter from Minyards. The previous one only mentions their existing employee
entrance. This new letter states that they will not be requesting a median cut at any location for their
employee parking lot.
Let me know if you need anything else. We are proceeding with the current design with two median cuts
on Bethel per the plan.
Regards,
BB
-----Original Message-----
From: Bruce Barclay
Sent: Monday, October 17, 2005 1 :48 PM
To: 'Suzan Taylor'
Cc: Kenneth M. Griffin (E-mail); Chad A. Jackson (E-mail); Jack Evans
(E-mail); Jeff Turner
Subject: RE: Minyards
Suzan,
Attached you will find the letter you requested from Minyards. Let me know if you or Ken have any
questions.
Thanks,
Bruce S. Barclay - Project Manager
Duke Construction
Phone: 972-361-6700
Direct: 972-361-6743
Fax: 972-361-6800
Cell: 214-878-3426
www.dukeconstructiononline.com
-----Original Message-----
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Wednesday, October 05, 2005 5:25 PM
To: Bruce Barclay
Subject: Minyards
Bruce:
I talked to Ken and he recalls that the west drive referred to in the 2nd paragraph of the March 2003 letter
is the drive immediately west of the existing employee parking lot drive. The one that is marked as 'future'
5/2007) Ken Griffin - RE: Minyards
Pa
on the aerial drawing. Since Minyards could not have a median opening at the existing drive - they wanted
to preserve the option of having one if they extended the west drive from the parking lot. Ken recalls that
the proposed drive immediately east of the US post office is a separate issue from the west drive referred
to in the 2003 letter.
Ken still wants a letter from Minyards in which they state they give up the option of the median opening
referred to the letter dated 2003.
I will be out of the office tomorrow and Friday.
Suzan
<< File: Minyards Response letter - Bethel Median Cuts.PDF >>