Jim Witt
Jerod Anderson; Ken Griffin; Vivyon Bowman
10/27/2005 9:29 AM
Re: Bethel Drainage project
Thanks this must have been the individual who called twice yesterday and once today while I was out and would not leave
a name. JW
>>> Jerod Anderson 10/27/05 9:26 AM >>>
FYI
I had a vendor call, who stated he did not bid, complain about the award of the project to Craig Olden. This vendor would not give
his name or the name of his company.
I had to reject Mike Albert as the low bid because he did not complete his bid documents and we awarded the bid to the second
low who happened to be Craig Olden. This vendor feels the City and myself have shown a preference toward Craig Olden on this
project and projects in the past. I assured him that was not the case and that Olden just happened to be the next low bid.
jerod