Loading...
(6/25/2007) Ken Griffin - Fwd: Questions: Bethel Road and Bass 5/2007) Ken Griffin - Fwd: Questions: Bethel Road and Bass Pro Drive Project Pa From: To: Date: Subject: Jerod Anderson gdkraus@transystems.com; jcmasterson@transystems.com; Ken Griffin 8/17/2006 3:00 PM Fwd: Questions: Bethel Road and Bass Pro Drive Project >>> Jeff Grigsby <jgrigsby@auigc.com> 8/17/2006 2:26 PM >>> Jerod, I have a few questions regarding the Bethel Road and Bass Pro Drive Project. 1. Do you have any soil borings or geotechnical reports for the bridge? 2. I couldn't find a traffic control plan in the Bass Pro Drive plans. I assume we are using the same phasing as Bethel Road. Will it be the contractor's responsibility to design and seal a TCP for Bass Pro? 3. No temporary pavement markings are shown on the Bethel Road TCP. Will temporary pavement markings be required? If so, will the contractor be reimbursed for the markings? 4. The bridge layout shows temporary shoring on both ends of the bridge. Is the temporary shoring subsidiary to the bridge? Based on the profile, there is 4.5 ft fill at the Enchanted Way intersection. When we install the temporary shoring in phase 1/ access to Enchanted Way will be cut off. Is this going to be a problem? 5. I am assuming we will need some type of positive barrier across the bridge and along the fill drop off (CTB or low profile CTB) when traffic is switched in Phase 2. Will the contractor be reimbursed for the cost of the CTB? 6. The phase line on the bridge layout shows constructing 30.5 ft in Phase 1. The sidewalk and bridge rail will consume 8 ft. We will need 4 ft for the CTB and buffer zone. This only leaves 2 rv 9 ft lanes for traffic in Phase 2. Can the sidewalk be poured after Bridge Phase 2 is complete? 7. Sheet 30 in the Bass Pro plans has a note to "use optional sidewalk anchor in Phase 1 Traffic Control Plan construction". I couldn't find an optional sidewalk anchor in the plans. Would be it be possible use an optional sidewalk anchor and eliminate the P-bars, or dowel in after the deck is poured? Any information you can provide will be greatly appreciated. Thanks, Jeff Grigsby, P.E. Civil Estimator Pyramid Building Systems Superior Services with an Exceptional Team 4775 North Freeway, Fort Worth, TX 76106 5/2007) Ken Griffin - Fwd: Questions: Bethel Road and Bass Pro Drive Project Pa Office: 817-926-4377 Fax: 817-926-4387 <htto:/ /www.auiqc.com/> www.auiqc.com www.ovramidbuildinq.com < htto: / /www.ovramidbuildinq.com/> NOTICE: The information contained in this communication is CONFIDENTIAL. It is intended solely for the person(s) to whom it is addressed. If the reader of this message is not the intended recipient, nor the employee or agent responsible to deliver it to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you receive this message in error, please delete and contact the sender. Thank you. Any views expressed in this message are those of the individual sender, except where the message states otherwise and the sender is authorized to state them to be the views of any such entity.