ATTENDAN~SE SHEET
NAME: COMPAN]Y: PHONE:
(~)
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
DATE:
TIME: ~" [~ ~ /V,
1 fl~vJ '/
ASSIGK~D INSPECTOR: ~ rr ~
I. A~ND~E: See Attached List)
II. PLUS ~IS~D ~: A) CI~ YES
/-
B~co~c~ ~s ~o
C) ~R YES
III. ~ILI~ C~IES N~IFIED:
A ) ~LEPHO~
B)
C) ~EC~IC
~ C~L~ T.V.
E)
E~~S YES NO
~LRO~ Pm~T
S~T C~-~ ~'
BORING PERMIT
V. I~PECTION:
A. DAILY INSPECTION BY ~SI~D INSPEC~R
B. ~R HOU~ ~D ~E~ (O~RTI~)
BE P~D BY ~ CONCUR "AT O~RTI~
~".
C. COerCeR ~D S~-CO~C~ ~
IRSPEC~R AT L~T ~-FO~ (24) H~
BE~ ~A~R/S~IT~Y S~/S~ S~R/
P~VI~ CONS~TIOR BEGINS.
(2)
VI. TESTING OF MkTERIALS:
i. DENSITIES
2. APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES -~'c/' NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
S UPERI NTENDENT:
X. GENERAL: DATE
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASSESSMENTS
WATER AND SEWER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
(4)
LEYTER OF ACCEPTANCE WRiTI~EN DATE:
LEY'PER OF ACCEPTANCE WILL NOT BE WRITI~EN UNTIL THE PUNCH LIST MADE FROM
THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMI%TING: AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER
TO THE CITY OF COPP~.T.L ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL
REPORTS ARE RECEIVED.
COR-TEN BOLTS IN FIR~fINGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ).
COLOR CODE HYDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINEERING DEPARTMENT.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE COM~I~NT.
LA~TISCAPE MAINTENANCE AGREEMENT.
(5)