attachment (6/25/2007) Ken Griffin - Fwd: Bethel Road Retaining Walls 1 th
5/2007) Ken Griffin - Fwd: Bethel Road Retaining Walls 1 thru 6
Pa
From:
To:
CC:
Date:
Subject:
Attachments:
<Johngay8@aol.com>
<gd kraus@transystems. com>
<kgriffin@ci.coppell.tx.us>, <chanson@iowabridge.com>, <lsmith@TiseoPavi...
3/20/2007 5:05 PM
Fwd: Bethel Road Retaining Walls 1 thru 6
Re: Bethel Road Retaining Walls 1 thru 6
Gary,
I wanted to forward this E-mail to you because after talking with Rick
O'Dell on Monday he came up with a response on how much and where to demo. Rick
also explained how he wanted to tie into the existing head wall footing and
retaining wall.
Rick did bring up the question for you Gary on the Type PR2 Pedestrian Rail
with parapet, Curt Hanson sent me a copy of the Pedestrian Rail Type PR1 and
I believe this will work as shown on plans. Curt is checking the cost
difference, if any and will get back to me.
Thanks, John Gay