Loading...
(6/25/2007) Ken Griffin - Bethel/Bass Pro 5/2007) Ken Griffin - Bethel/Bass Pro Pa From: To: CC: Date: Subject: "Robert Caudill" <rcaudill@TiseoPaving.com> "Ken Griffin" <kgriffin@ci.coppell.tx.us> "Robert Caudill" <rcaudill@TiseoPaving.com> 6/21/2007 5:16 PM Bethel/Bass Pro Ken, This is the revised quote for the 16" RCCP line lowering 1. 16" RCCP spoil ends and manufacturers services Freeport & Bethel Rd. 1 LS @ $3,500.00 = $3,500.00 2. Crew Time (5 to 6 Hrs.) 1 LS @ $2,500.00 = $2,500.00 3. Extra Equipment required Compressor, Pumps, & Shoring 1 LF @ $1,200.00 = $1,200.00 4. Subs Profit & Over Head 1 LS @ $600.00 = $600.00 Sub Total $7,920.00 Tiseo 1 Oo~ $ 792.00 Total $8,712.00 Robert Caudill Vice President Tiseo Paving Company (972) 289-0723