(6/25/2007) Ken Griffin - Bethel/Bass Pro
5/2007) Ken Griffin - Bethel/Bass Pro
Pa
From:
To:
CC:
Date:
Subject:
"Robert Caudill" <rcaudill@TiseoPaving.com>
"Ken Griffin" <kgriffin@ci.coppell.tx.us>
"Robert Caudill" <rcaudill@TiseoPaving.com>
6/21/2007 5:16 PM
Bethel/Bass Pro
Ken,
This is the revised quote for the 16" RCCP line lowering
1. 16" RCCP spoil ends and manufacturers services Freeport & Bethel Rd.
1 LS @ $3,500.00 = $3,500.00
2. Crew Time (5 to 6 Hrs.)
1 LS @ $2,500.00 = $2,500.00
3. Extra Equipment required Compressor, Pumps, & Shoring
1 LF @ $1,200.00 = $1,200.00
4. Subs Profit & Over Head
1 LS @ $600.00 = $600.00
Sub Total $7,920.00
Tiseo 1 Oo~ $ 792.00
Total $8,712.00
Robert Caudill
Vice President
Tiseo Paving Company
(972) 289-0723