Loading...
Duke Lesley 3C-CS070628T H E C I T Y O F COPPELL e x n s l 8 q June 28, 2007 Paul Bvrne, Project Manager Duke Construction Fax:972-361-6800 RE: Duke Lesley Addition, Point West I Lane Closure at Dividend Drive Dear Mr. Byrne: You have recently created an open cut in the pavement of the right southbound lane of Belt Line Road at the proposed Dividend Drive intersection. This cut was to facilitate the connection of the proposed RCP to the existing RCP in Belt Line Road. Due to inclement weather, it appears that failure may have occurred outside your traffic plates that are placed in the existing roadway. The failure appears to have compromised the right lane and we are concerned about it crossing into the middle lane of that portion of the roadway. As a result, we are asking you to close the lane adjacent to the curb and closely monitor the center lane overnight tonight. By tomorrow morning at 9:00 a.m., be prepared to meet me, with your trench safety engineer present, to discuss options for a permanent repair. Sincerely, ~sr Larry Davis Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Keith Flowers, Duke Construction fax 972-361-6800 Bob Beserra, San Saba Construction fax 972-509-8088 Tim Oates, Fire Marshal Police Department PD Dispatch Z ~~~ ~,l~~~l 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673