Freeport NIP(2.94)-CS070702T H E - C 1 T Y - O F
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, P.E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Fire Marshal
From: Albert Samaniego, Construction Inspector
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date: July 2, 2007
RE: WALK -THRU INSPECTION
Freeport Lot VIII at Freeport North, Lot 4R Block A
FILE
A final walk thru for paving, utilities and drainage on the referenced project has been
scheduled for:
Thursday, July 5, 2007 at 10:00
Please let me know if I can be of further assistance.
cc: Brian Pierce, fax #972/361 -6800
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"