WA9601B-CS 990730~7/38/1999 15:15 214-361~-~784 SHIMEK,JACOBS&~-~4KLE PAGE 82/82
SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Tcx~s 75225-5816 Fax (214) 361-0204 Phone (2 14) 361-7900
ROSS L. JACOBS, P-E.
RONALD v. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CAR'I~R, P.E.
GARY C. HENDRICKS, PE.
[. C FINKLEA. P.E. July 30, 1999
Transmitted Via Facsimile
Fox Contractors, Inc.
Post Office Box 951
Midlothian, Texas 76065
Re: City of Coppell, Texas
Sandy Lake Road Waterline
Wagon Wheel Ranch Elevated Tank to Denton Tap Road
Gentlemen:
Wc have received a verbal report from the City's testing laboratory, StanTcch Engineering in regards to the
cement-stabilized soil placed as backfill under Sandy Lake Road between s~tions 101+80 and 105+87.25. As
outlined in our letter to you dated May 19, 1999, this material was required to be tested and approved if it was
to remain in place. Based on results from field sampling and laboratory tests, the material placed is
considered to b~ equal to the specified backfill and can remain in place.
On behalf of the City, you are hereby directed to proceed immediately w~th the pavement repair at this
location. The City would like you to ~omplete this r~pair by the middle of next week. At your discretion, you
~re allowed to substitute full depth hot mix asphalt (8-inches thick) in lieu of the pavement repair specified in
the construction plans.
If you have any questions, please ~ontact this office.
/- ary C. ~s, P-E.
Mr. Kenneth M. Griffin, P.E.
Mr. Larry Davis