Loading...
Duke Lesley-CS061115 (2) DEVELOPMENT FEES PROJECT NAME: Duke Lesley Addition, Infrastructure ENGINEER: Pacheco Koch ORIGINATION DATE: 11/15/2006 DEVELOPMENT AGREEMENT SENT ASSESSMENT ASSESSED FEE AMOUNT PAn: DATE Water Impact Fee waived Wastewater Impact Fee waived Park Fee $165,165.00 Roadway Impact-Zone waived Street Sign Street Light Construction Inspection waived $20,331.64 EG or Bore Permit waived 3/12/2007 Overtime (San Saba) $432.00 $432.00 ra 3/14/2007 3/19/2007 Overtime (San Saba) $432.00 $432.00 3/21/2007 3/26/2007 Overtime (San Saba) $864.00 $864.00 4/18/2007 4/2/2007 Overtime (San Saba) $216.00 $216.00 4/18/2007 4/9/2007 Overtime (San Saba) $216.00 $216.00 4/18/2007 4/16/2007 Overtime (San Saba) $108.00 $108.00 4/18/2007 4/23/2007 Overtime (San Saba) $432.00 $432.00 5/1/2007 4/30/2007 Overtime (San Saba) $1,134.00 $1,134.00 5/11/2007 5/7/2007 Overtime (San Saba) $432.00 $432.00 5/14/2007 5/14/2007 Overtime (San Saba) $216.00 $216.00 5/22/2007 5/21/2007 Overtime (San Saba) $243.00 $243.00 5/30/2007 6/11/2007 Overtime (San Saba) $216.00 6/18/2007 Overtime (San Saba) $216.00 $216.00 cd 6/27/2007 Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/lrrig) Meter Deposit (Domestic) Meter Deposit (Fire/lrrig) Utility Final Inspection .t~~~ Subtotal to EnCl. $5,157.00 $4,941.00 $216.00 Total Fees Fees Paid Amount Owed TOTALS $5,157.00 $4,941.00 $216.00 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Reed. E.PA-N.O.1. Reed. Paving Bond Reed. Const. Plan Approved Utilities Bond Reed. Erosion Control Maint. CITY OF COPPELL JOURNAL ENTRY J.E. NO. 0 " Dq "6 ;;..;;Z PREPARED BY C2A3 DATE: ~-.2 7-01 POSTED BY: -1UJ DATE: G(2-n" 7 DESCRIPTION ACCOUNT DR. CR. NUMBER (tA,Af. ()1-ID~O .::J I (P. obI J~fuA ~1A~ j)V'CIWPIKL.~ ()/- D3 DO-1.o/90 d[(.;,'OO'-/ U () -r - tJ A-Jc() ;(J ~A.i b -Ih a - TOTAL THE.CITY.OF COPPELL June 18, 2007 Laurie Birdsell San Saba Construction Services 3100 Independence Pkwy Suite 311-PMB 314 PIano TX 75075 r;-;:"--:-h: L' . . 1..~ytJd..,. . j . . ; . r i" . c.:, . & ~..?:..?L9..2.1.,::!J RE: Duke Lesley Addition, Infrastructure Overtime Inspection Invoice Dear Ms. Birdsell: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, June 16, 2007. Four hours were charged to your company for that day. The overtime rate including salary and benefits is $54.00 per hour. PJ~ase scnd_E1~.QQY of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 CoppelL TX 75019 If you should have any questions, please call (972) 304-3679. ~ cc: Accounts Payable, Finance Dept. Project Fee File ______.~ _..~._"_ ___. _._' _____ __ ___..____ .. _______._.,_, ____.__.. .___._...._.__,._._________.._.....___...._.,___.~.._.,..__u__n_'.____.._.___... 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/3043673 VIEWPOINT BANK PO BOX 869105 PLANO, TX 75086 20801 118-11777/311 , , '.:,""'-"-:',:.--..-':.. --,', ,-., :. ,-.'-,,","," '- ..- ....-.,- '-'"",,,--.,.,-',',"':;;;";':- 6/25/2007 · $ ..216.00 Two H und red Sixteen and 00/1 00.................................................................................:..........:..:,. 1110 20BO .111 I:j. .gB???jl: ?~~ AUTHOR , ' ,,", Q. o . 0 j . g . j ... 0 III SAN SABA CONSTRlJ(n:10N~E:RVIC::E:S. INC::. CityofqoP~~II,,<,?' ." .;,.TYR' WWW.COIIPUCHECK$.COII ~,