Loading...
Alexander Ct-CS070706 Tim Bennett Engineering & Construction, Inc., d.b.a. TBEC 203 N. JacksoD Street P.O. B01 2077 Wylie, Texas 75098 Phone: (972) 429-3993 Fax: (972) 429-3963 Email: timbeDnett3@Verizon.net ~ rl<,-y ~007 Mr. Ken Griffm, P.E. City of Coppell, Engineering Department 255 Parkway Blvd. Coppell, TX 75019 ~u../ '- (!)0 AuL-.. Y Z. (!:)O '7 LEITER OF TRANSMITTAL: 2 sets of construction drawings for Alexander Court --; ~Nt> ~~t-{ (rrAL- ~, ~ ,~ 1")'" 1.... '~""7 Tim Bennett Engineering & Construction, Inc., d.b.a. TBEC 203 N. Jackson Street P.O. Box 2077 Wylie, Texas 75098 Phone: (972) 429-3993 Fax: (972) 429-3963 July 5, 2007 Kenneth Griffin, P .E. 255 Parkway Coppell, Texas 75019 RE: Alexander Court This letter is in response to your City review letter dated 6-25-07. PLAT 1-3. The final plat will be provided by Sempco Surveying DRAINAGE MAP 4. The base flood elevation ofthe proposed 100 year flood plain has been shown. 5. 2-10' standard inlets have been added on Knights Way. 6. Crown height has been changed to 6". 7. Wye inlet has been moved 15' closer to the East property line. 8. Positive overflow is provided for between lots 16 & 17 as shown on the grading plan. PAVING PLAN PROFILE 9. The proposed roll curb section has been replaced by Coppell Standard 2035. 10. Since Denton Tap Road is a major thoroughfare for the City of Coppell and the future residents of Alexander Court will be utilizing the proposed 5' sidewalk in only a slightly greater proportion than other citizens of Coppell, it should be the City of Coppell' s responsibility to construct this sidewalk. 11. The building pads of Lots 17 & 18 have been raised so that the finished floors of these homes will be l' above the top of curb. The front yard in the west side of Lot 18 has been elevated so that it drains toward the street. It is the desire of the home builder and developer to have circle drives for these lots with regrading described above, we request permission to put driveways on the east and west sides of Lot 18. 12. These lots have been regraded as required. STORM SEWER 13. Line "A" has been extended to the creek bank and the headwall placed on a 18" diameter pier. Another storm sewer sheet has been added. WATER & SANITARY SEWER PLAN 14. All storm sewer radii have been lengthened to a minimum of 300' and several curves eliminated. A 300' radius curve has been utilized on Lot 23 to tie into the existing manhole. Lot 23 can still accommodate the builder's desire for an 70' x 80' building pad. 15. The City ofCoppell has an existing 12" sewer trunk line which runs along the south bank of Grapevine Creek through this addition. This sewer has been abandoned. The pipe is vitrified clay and has an average cover of 5 feet. We propose to abandon the sewer line in place. With this depth of cover, any collapse of the sewer line should be bridged by the soil above it and have minimal effect at the surface. We propose to cut off the tops of the manholes two feet below the ground surface, and fill the manholes with sand. See notes on the utility plan. Sanitary Sewer Profile 16. All water crossings have been shown. Lot Grading 17. The 3: 1 slopes utilized on some of the lots are not too steep to maintain. The slopes are on private property and shall be maintained by the homeowners. 18. A detail of the retaining wall is included in these plans. 19. Lot 17 & 18 have been raised. 20. The finished floors shown are 1 foot above the ultimate flood elevation, which 21. A detail of the proposed retaining wall is included with these plans. Erosion Control 22. The construction entrance has been shown. Sincerely, .~~ ,/ Tim Bennett, P .E.