Amberpoint 1A-CS070713
iii HaIff Associates
8616 Northwest Plaza Drive
Dallas, Texas 75225-4292
(214) 346-6200
Fax (214) 214-361-5573
TO:
Mr. Ken Griffin, P.E.
City of Coppell Engineering Dept.
255 Parkway Blvd, P.O. Box 478
Coppell, TX 75019
LETTER OF TRANSMITTAL
J
07/1 e./07
DATE:
AVO:
25027
PROJECT: Staples Expansion, Lot 1AR, Block A
Amberpoint Bus. Park at Coppell
Coppell, TX
FROM: Cody Graham, E.I.T.
cgraham @ halff .com
VIA:
Courier
WE ARE SENDING YOU IZI Attached:
o Shop Drawings IZI Prints
o Copy of letter 0 Change order
o Under separate cover:
o Plans 0 Drawings
o Submittal 0 Other:
o Specifications
THESE ARE TRANSMITTED as checked below:
IZI For approval
o For your use
o As requested
o For review/comment
o Approval as submitted
o Approved as noted
o Returned for corrections
o Other:
o Resubmit _ copies for approval
o Submit _ copies for distribution
o Return _ corrected prints
ITEMS SENT:
7 - Copies of signed and sealed Engineering Construction Plans for Staples Fulfillment Center Expansion.
COMMENTS:
Ken, attached is our signed and sealed engineering submittal with revised plat for the above project. Please call
214.346.6315 if you have any questions or problems. Thanks!
SIGNED: Cody Graham, E.I.T.
PREPARED BY: Halff Associates
COPIES:
IZI File
IZI Owner
o Contractor
o Other:
~
l3 r1t..A- L... '0 {
1:\25000s\25027\admin\lot\lOT 07-12-07 KG.doc