Amberpoint 1A-CS070716
THE.CITY.OF
corrELL
_'>'. '.~";.~ ~.,~ S'.',. ,:,( ,.,:L'.""""c, /ii;>c;
.,' ~",. ,~""y l .;:a,~.:J.l'~ v
'i' ",.~~"" ,~;?~~. '. ,],
I' ~~~"~~~fi.7~~~' \)
C -....~ .'^.~-.;;? q
.r A" . \ '6
July 16,2007
Mark W. McGraw
Halff Associates 8616
Dallas. TX 75225
RE: Amberpoint, Lot lAR Block A (Staples Expansion)
Pre-construction Conference
Dear Mr. McGraw:
A pre-construction conference on the referenced project has been scheduled for
Thursday, July 19, 2007 at 3:00 p.m. in the Lobby Conference Room in Town Center at
255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Albert Samaniego
Construction Inspector
Office Phone: 972-304-3685
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
255
PARKVVAY * POBOX 9478 * CQPPELL TX 75019 * TEL 972/462 0022 *
FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner / owner representative 's responsibility to notify the following
parties:
. Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
. Geotechnical firm
. Project Engineer
. Contractors or subcontractors for excavation, utility, & paving operations
. SWPPP representative