Loading...
ST9902-LR070626 In-Place Soil Moisture/Density Tests by Nuclear Method CMJ ENGINEERlNG, lNC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell Project: West Sandy Lake Road/' Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-209 Report Date: 06/26/2007 Specifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data Date Tested: 06/20/2007 Technician: Jory Goldring M~tgr@:~~felincI!Gui)l~Da!a 2276 ASTM 0-698 Material Description Reddish Brown, Tan and Gray mottled Sandy Clay Optimum Moisture % Maximum Dry Density pcf 115.0 '-- Curve No. Test Method 14.0 --- In-Place Test Results Test Elevation Ref. Probe Percent Wet Density Dry Density Percent No or Lift Location Curve Depth Moisture (pet) (pet) Density Trench Backfill: Paving Cutout 314.0 Final Sandy Lake Road & North Cappel Road 2276 6" 19.2" 120.0 100.7 315.0 -1' BFG Sandy Lake Road & North Cappel Road 2276 6" 19.6' 122.0 102.0 316.0 -2' BFG Sandy Lake Road & North Cappel Road 2276 6" 20.1" 121.7 101.3 An asterisk (") appears next to test results which do NOT meet the project specifications. Test Method(s): ASTM 02922, ASTM 03017 Additional Remark(s): BFG = Below Final Grade * Non-Compliant: John Gay with Tiseo Paving Company was Notified Gauge: Troxler Gauge SN: 36035 Std. Density Count: 2650 CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results d<;, not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1 In-Place Soil Moisture/Density Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 St c1L1 0--:2 P Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-209 Report Date: 06/26/2007 Specifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data M~J~rialB.~fer~iic~ CLJty~[)~!ll Date Tested: 06/20/2007 Technician: Jory Goldring Curve No. Test Method Material Description Reddish Brown, Tan and Gray mottled Sandy Clay 2276 ASTM 0-698 In-Place Test Results Test Elevation Ref. Probe No or Lift Location Curve Depth Trench Backfill: Paving Cutout 314.0 Final Sandy Lake Road & North Coppel Road 2276 6" 315.0 -1' BFG Sandy Lake Road & North Cappel Road 2276 6" 316.0 -2' BFG Sandy Lake Road & North Cappel Road 2276 6" An asterisk (*) appears next to test results which do NOT meet the project specifications. Test Method(s): ASTM 02922, ASTM 03017 Additional Remark(s): BFG = Below Final Grade * Non-Compliant: John Gay with Tiseo Paving Company was Notified illY Optimum Maximum Dry Moisture % Density pcf 14.0 115.0 Percent Moisture Wet Density Dry Density (pet) (pet) Percent Density 19.2* 19.6* 20.1* 100.7 102.0 101.3 120.0 122.0 121.7 /' life ~k- Gauge: Troxler Gauge SN: 36035 Std. Density Count: 2650 CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1