Loading...
Rolling Oaks MC-CS070702 Page 1 of 1 Rhonda Adloo - Re: Coppell Cemetery From: To: Date: Su bject: CC: Ken Griffin mdaniel@ndmce.com 7/2/2007 5:12 PM Re: Coppell Cemetery Tim Oates elry FlJalt./f'IF5 H~LUY -fIItP/5/ T/2,4CJ r (a -€7'1~ ray) Mike The only thing that could change may be additional fire hydrants. You may want to check with Tim Oates to determine how they would handle a fire in the cemetery. If additional fire hydrants are needed, then the 2" waterline would need to be upsized to a 6 or 8" waterline. Long term there will be issues with the trail and potential buildings on the east side that encroach in the floodplain and waters of the US. I'm copying Tim on this response. Hope this helps. Ken Griffin >>> Mike Daniel <mdaniel@ndmce.com> 7/2/20073:22 PM >>> Ken, We are being asked to help develop budget numbers for the infrastructure costs in phase 1. Before we do anything more, I would like to get Staff's comments on our preliminary plans. Has your department had a chance to look them over yet? Mike Daniel, PE, RPLS Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 (214) 739-4741 (214) 739-5961 FAX mdaniel@ndmce.com file ://C: \Documents%20and%20Settings\rbrother\Local%20Settings\ Temp \XPgrpwise\468 9... 7/5/2007