DR8802-CS 911104 (2)TO: Alan D. Ratliff, City Manager VIA: ~ary L. Sieb, Director of Planning and Community Services FROm M. Shohre Danes and. Acting City ngineer SUBJECT: N. ](aye St. Drainage Improvements DATE: November 4, 1991 The bid opening for the above referenced project was held on October 28, 1991, and there were only two bids received. The apparent low bid is $190,858.76 from Rhode Construction Company, which is considerably higher than the available funds of $100,000 (±) for this project. According to Mr. Terry Mitchell, P.E. of Carter & Burgess, Inc., the main reason for the increase in cost is due to narrow (in some areas only 5 feet)) drainage easements. This limitation would minimize the use of machinery for the project, and would require the system to be hand laid which increases the labor cost. There are several options available which can be looked at, and our co~me~ts are provided below: 1) The received bids are not competitive and staff recommends that the low bid be rejected. 2) This drainage improvement project be rebid again, with an attempt to have a pre-bid conference, and having alternate pipe material, etc. 3) In-house resources be evaluated to determine if this project can be implemented by City Staff. This would require proper planning and some reprioritization of current projects. Should you have any questions, please let us know. Enclosure / cc:%/~arry Davis, Construction Inspector KAYE99