Loading...
Northlake College-CS070720 THE.CITY.OF COPPELL .~>C.~.'~'.'~..' ~.";,~., ~\'<l JdJ. ;.";;N!>.i~:J:i'\1 '~~-~."~ t".~. ~~ ~ -i' f ~"'~~.."'._ , _~"}".'."'-~~() (. -... ~ ~^' .~--- q .\' AS"' \ l\ July 20, 2007 Guy R. Bradley, P.E. Lopez Garcia Group 1950 Stemmons Freeway, Suite 6000 Dallas, TX 75207 RE: Northlake College-North Campus Construction Plan 2nd Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer: General Comments 1. Include the plat. Gradin2 Plan/ Storm Sewer Plan 2. The 6'X3' box on Royal Lane does not tie into the 6'X3' connected to the existing drop inlet on the northeast corner of this property. There is another box system that runs parallel to that, (see W. Sandy Lake Road Drainage plans ST99-02). 3. Include grading with the left turn lane plan. 4. Does the grading plan have enough detail and information to build? 5. You have put a 10' curb inlet behind the sidewalk in the center of the project, will this work? (Grading plan needs more detail) Utilitv Plan 6. The fire hydrant on the entrance driveway off Royal Lane is not required. 7. Fire hydrants will be required in the future along the west side of the parking lot, it would be easier to install at this time. 8. You are proposing to tie a 10" Sanitary Sewer into an 8" existing, which then ties back into a 10". 9. Show storm sewer crossings on sanitary sewer profile. swppp 10. Protect inlets on site once installed. 255 PARKVI,.'AY * POBOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 Please make the necessary changes and submit these marked-up plans and two sets of revised plans to the City for review. If you have any questions, please contact this office at your convemence. MIC arza, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail: mgarza@ci.coppell.tx.us